Similar Projects
Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Wet Well Cleaning
Term Contract
Results
Stoughton, MA

Oak Street Replacement Wells 7R, 9R, and 10R
Results
Less than $815,000 est. value
Foxborough, MA 02035

Engine 17 Prequalification
Infrastructure
Post-Bid
$17,200,000 est. value
Boston, MA

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Provide Annual Well Cleaning and Reconditioning Services
Term Contract
Post-Bid
$100,000 to $150,000 est. value
Franklin, MA

Drinking Water Supply Well Rehabilitation
Results
$45,000 est. value
Bellingham, MA

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids
Results
$125,000 est. value
Boston, MA

Wells 3 and 4 Water Treatment Plant - General Bids
Results
$8,400,000 est. value
Medfield, MA 02052

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Results
$8,400,000 est. value
Medfield, MA 02052

Well 3A Submersible Pump and Motor Replacement
Results
$20,630 est. value
Needham, MA

Cleaning Redevelopment and Chemical Treatment of Gravel Packed Wells
Infrastructure
Results
Less than $85,000 est. value
Walpole, MA

Replacement / Installation of a New Recycle Pump and Motor at the Water Treatment Plant
Infrastructure
Results
$24,292 est. value
Needham, MA

Double Suction Pumps and Appurtenances
Infrastructure
Results
Boston, MA

Last Updated 12/23/2021 11:13 AM
Project Title

Well Station 4 Booster Pump System

Physical Address View project details and contacts
City, State (County) Sharon, MA 02067   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work under this contract includes, but is not necessarily limited to: furnishing and installing a booster pump skid with associated piping, valves, concrete equipment pad, protective shed, associated electrical work, start-up, testing, and training. DCAMM Certificate Required.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents