Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Koz on West 4th Avenue
New Construction, Infrastructure - 172,000 SF
Design
$98,800,000 CJ est. value
Spokane, WA 99204

I-5, Mounts Road to Steilacoom - DuPont Road - Corridor Improvements
Infrastructure
Bidding
$210,000,000 CJ est. value
Fife, WA 98424

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Construction of the Transportation Cooperative
New Construction, Infrastructure
Post-Bid
$7,570,000 CJ est. value
Selah, WA 98942

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

Rehabilitate Parking Area, Ruby Beach, Olympic National Park
Infrastructure
Construction
$772,030 CJ est. value
Port Angeles, WA 98362

Pullman-Moscow Regional Airport - PMRA Terminal 2020
New Construction, Infrastructure
Construction
$49,000,000 CJ est. value
Pullman, WA 99163

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

South Lake Union the Mercer Blocks
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Seattle, WA 98109

Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

Last Updated 11/21/2022 03:10 PM
Project Title

Agate Beach Water System Improvements Phase 2 - Reservoir and Booster Station

Physical Address View project details and contacts
City, State (County) Shelton, WA 98584   (Mason County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $998,252 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Agate Beach Water System Improvements Phase 2 - Reservoir and Booster Station Alternatively, the Contractor may use the PUD drop box located outside the front office. The PUD makes no guarantee that bid packages submitted by mail will arrive prior to the bid deadline. The District may, at its sole discretion, reject any or all bid proposals submitted. The District shall not be liable for any costs incurred in connection with the preparation and submittal of any bid proposal. The District reserves the right to waive any informality in a submitted proposal. SCOPE OF WORK: Construct a new 50,000-gallon reinforced concrete reservoir with booster pump station, standby generator, site piping, site improvements, security fencing, and temporary erosion and sedimentation control. The Work shall be physically complete within 120 calendar days after the commencement date stated in the Notice to Proceed. Contractor must acknowledge receipt of any addenda (if applicable). Contractor is required to bid entirety of the Proposal. Prospective bidders are required to participate. Compliance with State & Federal Grantor Regulations Financing of the Project has been provided by Mason County Commissioners and PUD 1 through the American Rescue Plan Act (ARPA). All contractors and subcontractors are required to pay Washington State prevailing wages. Mason County PUD No. 1 is an equal opportunity employer; small, minority and women owned firms are strongly encouraged to apply. The engineering estimate for this project is projected to be between $400,000 - $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents