Similar Projects
Last Updated | 07/27/2022 03:03 AM |
Project Title | 2022 Street Reconstruction Castle Creek |
Physical Address | View project details and contacts |
City, State (County) | Omaha, NE 68102 (Douglas County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Castle Creek SID 501, Douglas County - 2022 Street Reconstruction DESCRIPTION Concrete Pavement Repair, Large Area- 417SY Concrete Pavement Repair, Small Area-439 SY Full Depth Saw Cut Existing Pavement-1000 LF Adjust Manhole to Grade-3 EA Remove & Replace PCC Sidewalk-48 SF Remove & Replace PCC Curb Ramp-169 SF Remove and Replace Faulty Subgrade-25 TN The work consists of the removal of the existing pavement and replacement of Portland Cement Concrete pavement of varying widths with a minimum thickness of seven inches for large areas and nine inches for small areas, together with integral curb and gutter, sidewalks, curb ramps, and necessary removals, subgrade preparation, and necessary appurtenances for a completed improvement. The streets to be maintained are within dedicated public right-of-way. These specifications relate to the removal and construction of concrete pavement, sidewalks, curb ramps and other work incidental and necessary for a completed improvement in Douglas County Sanitary and Improvement District 501, which project is located in the vicinity of North 156th Street & Fort Street within CASTLE CREEK |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |