Similar Projects
China Poot Bay Lodge and Restaurant / Homer
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Homer, AK 99603

Terminal Road And Parking Lot Improvements - City of Kenai
Infrastructure
Conception
$1,750,000 CJ est. value
Kenai, AK 99611

Small Projects SATOC, Various Locations, Alaska
Renovation
Design
$5,000 to $20,000,000 est. value

2022 Visitors Center Roof Replacement
Renovation
Design
$700,000 CJ est. value
Kenai, AK 99611

Headquarters Lab Construction/Renovation at Kenai National Wildlife Refuge (NWR)
Renovation
Bidding
$250,000 CJ est. value
Soldotna, AK 99669

Kwechak Creek Maintenance
Infrastructure
Bidding
$200,000 CJ est. value
Seward, AK 99664

Central Emergency Services Arc Loop Training Pad Expansion
Infrastructure
Post-Bid
Kalifornsky, AK 99669

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Nanwalek-Port Graham Airport Relocation Drilling Services
Term Contract, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
AK

Skyline Drive Asphalt Rehabilitation
Infrastructure
Results
$344,805 CJ est. value
Soldotna, AK 99669

Apron And Willow Street Extension - City Of Kenai
Infrastructure
Conception
$2,350,000 CJ est. value
Kenai, AK 99611

Gravel CIP - Sport Lake Road / Hakala Drive / Cotman Court
Infrastructure
Bidding
$150,000 CJ est. value
Soldotna, AK 99669

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Lilac Street Repairs - City Of Kenai
Infrastructure
Conception
$393,000 CJ est. value
Kenai, AK 99611

Sewer System Installations
Infrastructure
Bidding
$200,000 CJ est. value
Kenai, AK 99611

Last Updated 09/01/2022 05:34 PM
Project Title

RFQ D/B - HERC 2 - Hazardous Materials Abatement

Physical Address View project details and contacts
City, State (County) Homer, AK 99603   (Kenai Peninsula County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For HERC 2 - Hazardous Materials Abatement All firms intending to submit a SOQ must submit a City of Homer Plan Holders Registration form to be on the Plan Holders List to be considered responsive. Plan holder registration forms and Invitation to Bid packages are available online electronically The work will consist of: I. Design Work Preparing plans and specifications to govern the Construction Work required to successfully abate asbestos in the HERC Building 2, as set forth in the report entitled Hazardous Building Materials Survey, dated March 26, 2020, prepared by Environmental Management, Inc. Preparing an Hazardous Materials Abatement Plan Quality Assurance Plan for the Construction Work II. Construction Work Project Management Health and Safety Plan Traffic Control Furnishing all labor, materials, equipment, supervision, and other facilities necessary to successfully abate the hazardous materials as set forth in plans, specifications and other deliverables prepared during the Design Work. After reviewing and evaluating the SOQs, the City will issue the Request for Proposals to those firms deemed qualified. Proposals, which will contain cost information, will be due no later than October 17, 2022. Please direct all questions in writing regarding this project to: Janette Keiser, PE, Public Works Director City of Homer Public Works Dept. 3575 Heath Street Homer, Alaska 99603 Email: jkeiser@ci.homer.ak.us Phone: (907) 435-3141 The City of Homer reserves the right to accept or reject any or all submissions, and to waive irregularities or informalities in the submissions.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents