Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Mission Ridge Resort Expansion
New Construction
Conception
Wenatchee, WA 98801

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

SR 971/Navarre Coulee Site 5 - Rock Slope Scaling
Infrastructure
Design
$300,000 CJ est. value
Chelan, WA 98816

Lift Station No. 2 Upgrades Rebid
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Manson, WA 98831

Lift Station No. 2 Upgrades Rebid
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Manson, WA 98831

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Columbia to Sanders Water and Sewer Main Replacement
Infrastructure
Results
$1,300,000 est. value
Chelan, WA 98816

2022 Western Region Pavement Preservation MATOC
Alteration
Results
$300,000 to $10,000,000 est. value

Chelan County Public Utility District Service Center Project - Bid Package 08.20
New Construction, Infrastructure
Construction
$105,000,000 CJ est. value
Wenatchee, WA 98801

Springhill Reservoir Embankment Improvements - Rebid
Infrastructure
Construction
$82,624 CJ est. value
Wenatchee, WA 98801

Regional Aquatic Center / Wenatchee Landing - City of Wenatchee
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
Wenatchee, WA 98801

Microsoft Data Center / Malaga
New Construction, Infrastructure - 750,000 SF
Pending Verification
$160,000,000 CJ est. value
Malaga, WA 98828

Sanders Street Crosswalks & Bulbouts Construct - City of Chelan
Infrastructure
Conception
$700,000 CJ est. value
Chelan, WA 98816

Last Updated 07/18/2023 06:05 AM
Project Title

Icicle Road and US 2 Roundabout

Physical Address View project details and contacts
City, State (County) Leavenworth, WA 98826   (Chelan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,793,365 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for roundabout construction at the intersection at Icicle Road and US Highway 2 in Leavenworth, WA and includes installing asphalt paving, curbing, sidewalks, watermain, stormwater system, infiltrations gallery, illumination, striping, signing and other work as described in the contract documents and Plans. Est. Completion Date: Sept. 28, 2023 This contract provides forroundabout construction at the intersection at Icicle Road and US Highway 2 in Leavenworth, WA and includes installing asphalt paving, curbing, sidewalks, watermain, stormwater system, infiltrations gallery, illumination, striping, signing and other work as described in the contract documents and Plans. 21-0145

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents