Similar Projects
Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Tully Road Ballfields Dog Park Improvements - City of San Jose
Renovation, Infrastructure
Conception
$500,000 est. value
San Jose, CA 95121

Eterna Tower
New Construction, Infrastructure - 1,500 SF
Design
$37,000,000 CJ est. value
San Jose, CA 95113

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Fish Protection Measure: Chillers Plant Project
Renovation, Infrastructure
Bidding
$5,167,000 CJ est. value
Morgan Hill, CA 95037

Fish Protection Measure: Chillers Plant Project
Renovation, Infrastructure
Bidding
$5,167,000 CJ est. value
Morgan Hill, CA 95037

Construction at Huff Gardens Apartments - Exterior Envelope and Site Improvements
Infrastructure
Post-Bid
$525,000 CJ est. value
San Jose, CA 95128

Sunnyvale Traffic Signal Upgrades
Infrastructure
Post-Bid
$2,166,566 CJ est. value
Sunnyvale, CA 94087

Cast Iron Sanitary Sewer Replacement Package V
Alteration
Results
$1,015,707 est. value
San Jose, CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

SCWP - Secondary Treatment and Dewatering Project
Renovation
Construction
$277,872,751 CJ est. value
Sunnyvale, CA 94087

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

The Mark / San Jose
Demolition, New Construction, Infrastructure - 365,424 SF
Pending Verification
$65,700,000 CJ est. value
San Jose, CA 95112

Route 87/Taylor Bike/Ped Improvements - City of San Jose
Infrastructure
Conception
$532,000 est. value
San Jose, CA 95110

Last Updated 07/19/2023 04:20 PM
Project Title

Rinconada Water Treatment Plant Reliability Improvement Project Phases 3-6

Physical Address View project details and contacts
City, State (County) Los Gatos, CA 95032   (Santa Clara County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $303,900,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Addendum 1, 3, 6 & 8 is confidential and requires a signed NDA. Please reach out to the owner for the NDA form to obtain documents. Please refer to Notice to Bidders for the full Summary of Work for this Project. Question Deadline 06/23/2023 at 11:59 PM PT Online Q&A Yes License Requirements Class A Estimated Bid Value $230M-$260M bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents