Similar Projects
South Westshore Boulevard Townhomes
New Construction
Conception
Tampa, FL 33611

West Port Phase 2
New Construction
Conception
Port Charlotte, FL 33953

Kanner Oaks
New Construction
Design
Stuart, FL 34994

Flagler Village
New Construction
Design
Palm Coast, FL 32135

Home Demolition and Reconstruction - 1113 Balkin Road
New Construction, Demolition - 1,200 SF
Bidding
$160,000 est. value
Tallahassee, FL 32305

Arthur Mays Brick Up 2
Renovation
Bidding
Miami, FL

Avalon by the Beach
New Construction - 90,000 SF
Post-Bid
Hutchinson Island, FL 34949

Rehabilitation - 3714 Brophy Boulevard
Post-Bid
Cocoa, FL 32926

SHIP Rehabilitation - 2003 Avenue N North
Results
Fort Pierce, FL 34950

Housing Rehabilitation Program for Volusia County Community Assistance
Term Contract
Results
FL

Polo Legacy Saddlewood - Master Plan
New Construction - 48,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Lake Worth, FL 33467

Reunion West - Phase 4
New Construction
Construction
Kissimmee, FL 34741

Braden Pointe
New Construction
Pending Verification
Bradenton, FL 34203

K-Bar Ranch - Parcel E and F
New Construction
Pending Verification
Tampa, FL 33608

Olympus - David Weekley Homes
New Construction
Conception
Clermont, FL

Reported 07/06/2022 09:32 AM
Project Title

Mash Pointe Subdivision

Physical Address View project details and contacts
City, State (County) Fernandina Beach, FL 32034   (Nassau County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a residential development in Fernandina Beach, Florida. Conceptual plans call for the construction of a five-unit residential development. Plans call for the construction of a 5 lot residential subdivision. As of July 5, 2022, this project is in the early planning stages, and received technical approval for site engineering plan and the preliminary plat from the Nassau County Development Review Committee. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Single-Family Homes, New Construction, 5 Lots.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents