Similar Projects
Well and Booster Pump Equipment Maintenance Service
Bidding
Goodyear, AZ 85338

N--Install Variable Frequency Drive (VFD) Control Pannel on Pumps @ National Memorial Cemetery of Arizona
Post-Bid
Phoenix, AZ 85024

Chilled and Hot Water Loop Pump Replacement for ARS Maricopa
Post-Bid
Maricopa, AZ 85138

Barney Farms Lake Well and Barney Farms Tank Site Well
Results
Queen Creek, AZ

Pump Maintenance and Repair
Results
Avondale, AZ

Valentine Well
Post-Bid
Phoenix, AZ 85027

Mark Wilmer Pumping Plant Unit 6 Motor Rewind
Results
Less than $3,800,000 est. value
Phoenix, AZ 85024

Dry Well And Interceptor Pumping And Inspection
Post-Bid
Phoenix, AZ

Water Well Equipment and Services
Term Contract
Results
Tempe, AZ 85281

Trailer Mounted Water Pumps
Post-Bid
Phoenix, AZ 85003

Water Wells and Pump Maintenance and Repair Services
Results
$3,000,000 est. value
Scottsdale, AZ

CMAR for Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Post-Bid
Gilbert, AZ 85297

Reservoir, Pump Station and Well Conversion
Results
Gilbert, AZ 85233

Chilled Water Pump
Post-Bid
Tempe, AZ 85283

Chill Pump Replacements
Results
$25,000 to $100,000 est. value
Maricopa, AZ 85138

Last Updated 10/23/2019 08:21 AM
Project Title

Groundwater Well Cleaning Disinfection Services

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85003   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000 to $40,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Work includes the well case; cleaning which includes swabbing and using an acid solution as needed; and using bleach to disinfect the groundwater monitoring wells located at the 23rd Avenue Wastewater Treatment Plant and the 91st Avenue Wastewater Treatment Plant (WWTP). There is one groundwater monitoring well at 23rd Avenue WWTP and five wells at 91st Avenue WWTP. The wells are approximately 4-inches in diameter. The following information is provided for the 23rd Avenue WWTP: 1. Well 733.09 “APP–2” – north of 35th Avenue Bridge, east side of road –well depth: approximately 98.6-feet. The following information is provided for the 91st Avenue WWTP: 1.Well “MWA” 743.01 – northwest corner of the Northeast Lagoon #445 – well depth: approximately 60-feet. 2.Well “MVD” 743.04 – southeast corner of digester cleaning lagoons – well depth: approximately 60-feet. 3.Well “MWL” 743.17 – north of North Gate Guard House – well depth: approximately 60-feet. 4.Well “MWM” 743.19 –north of final effluent channel at 91st Avenue – well depth: approximately 60-feet. 5.Well “POC Well” 743.36 – west of Tres Rios Wetlands – well depth: approximately 60-feet. Locations: 1.91st Avenue Wastewater Treatment Plant, 5615 South 91st Avenue, Central Operations Building #30, Tolleson, AZ 85353. 2.23rd Avenue Wastewater Treatment Plant, 2470 South 22nd Avenue,Central Operations Building #48 Phoenix, AZ 85003
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents