Similar Projects
Last Updated | 09/14/2020 12:41 PM |
Project Title | Rectification of Detention Ponds at Wood Creek Estates Precinct 2 |
Physical Address | View project details and contacts |
City, State (County) | Conroe, TX 77301 (Montgomery County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project completes the formerly proposed but unfinished detention ponds within Wood Creek Estates, along with an alternate that seeks to replace a deep HDPE storm sewer trunk line with a reinforced concrete pipe. The work to be performed includes cleaning and reshaping the existing ponds, excavating portions of the ponds, placing embankments to achieve the proposed top of berm elevation at all parts of the ponds, removing an existing overflow structure, creating a new outfall structure with emergency overflow, grading a 10’ wide maintenance path, and sodding. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |