Similar Projects
Spring Ridge Pool House
Renovation
Design
Frederick, MD 21701

Concession Stand Public Restroom Renovation
Renovation
Post-Bid
Fruitland, MD

VC Bathrooms Renovation
Renovation
Post-Bid
Less than $56,000 est. value
Lexington Park, MD 20653

Restroom Upgrades
Results
Frederick, MD 21701

Day Use Bathhouse Renovations
Renovation
Results
$500,000 to $1,000,000 est. value
Boonsboro, MD 21713

Restroom Improvements - Phase I
Construction
$15,000,000 est. value
Glen Burnie, MD

Patrick Center First Floor Restrooms
Renovation - 195 SF
Post-Bid
Frederick, MD 21701

Beverly Triton Nature Park
New Construction
Results
$3,000,000 est. value
Edgewater, MD 21037

Construction Services - Maynard Burgess House - Interior Renovation and Addition
Renovation, Addition - 4,410 SF
Post-Bid
Annapolis, MD 21401

Patapsco Avenue Park-N-Ride Comfort Station
New Construction
Results
$500,000 to $1,000,000 est. value
Halethorpe, MD 21227

US 29 Bus Rapid Transit Improvements - Operator's Comfort Station at Briggs Chaney Park and Ride Station
New Construction
Post-Bid
Silver Spring, MD

Rocky Mountain Vault Toilet Seneca Creek State Park
Results
Boyds, MD 20841

Fairgrounds Park Restroom Renovation
Renovation
Results
$100,000 est. value
Hagerstown, MD 21740

Renovation of the Municipal Pool Design-Build
New Construction, Infrastructure - 440 SF
Results
Westminster, MD 21158

Isreal Park Shelter Replacement
New Construction, Demolition
Results
Less than $395,000 est. value
Rockville, MD 20850

Last Updated 01/18/2022 01:27 PM
Project Title

Bath House Renovations at Dans Mountain State Park

Physical Address View project details and contacts
City, State (County) Lonaconing, MD 21539   (Allegany County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of renovations to the existing bath house at Dans Mountain State Park including but not be limited to: 1. The interior renovation of a bath house including men’s toilet and changing areas, women’s toilet and changing areas, administrative area, ticketing area, life-guard area, as well as replacing indicated exterior walls, installing a new facade, and other Work. 2. The existing propane tanks, plumbing fixtures, domestic hot water re-circulation pump, and piping (propane, cold water, hot water, hot water re-circulation, sanitary and sanitary vent) shall be demolished and replaced with new. The instantaneous water heaters shall remain and be re-used. The roof storm water drainage system is existing to remain except where required to be reworked to accommodate changes in the building footprint. 3. All plumbing fixtures installed under this contract shall be low flow. Condensate piping for the ductless split system air handling units shall be piped to discharge about the roof. The entire domestic water system (plumbing fixtures, piping, water heaters, etc.) shall be drainable to prevent freezing during the winter. The existing swimming pool equipment is existing to remain and shall not be modified under this contract. 4. All existing roof mounted exhaust fans and ductwork serving the locker rooms and the areas between them shall be demolished. All mechanical equipment serving the pool room shall remain. New roof mounted supply air fans with filters, roof mounted exhaust fans, along with all required associated ductwork, air devices and controls, shall be provided to ventilate the lockers rooms. The core areas between the locker room shall be conditioned via a roof mounted, multi-port air, cooled condensing unit with three (3) ductless air handling units in the spaces. The core areas shall also receive outdoor air to meet code requirements from the supply fans. 5. The electrical work includes providing high efficiency LED lighting fixtures and lighting controls. Emergency and exit lighting shall be provided in accordance with the applicable codes. Electrical and telecom outlets shall be provided. Power shall be provided for all equipment. 6. Contractor is to perform and coordinate testing and costs for the presence of Lead and Asbestos, and to proceed with any required remediation work.

Details

Restroom/Bath House, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents