Similar Projects
Preventive Maintenance, Tuning, Calibration, & Testing of Four (4) Dual Fuel (gas/oil) Boilers
Design
Woodlawn, MD 21207

Replace Hot Water Boiler
Alteration
Bidding
Less than $100,000 est. value
Annapolis, MD 21401

Altmeyer Boilers Service Contract
Term Contract
Bidding
Woodlawn, MD 21207

Comprehensive Mechanical Maintenance Services
Term Contract
Post-Bid
MD

H945--Perform Root Cause Analysis Failure at the Loch Raven VAMC Domestic Water System to Pinpoint Leak
Post-Bid
Baltimore, MD 21201

Preventive Maintenance and Service for Water for Injection/Pure Steam/Distribution Systems, WRAIR
Results
Silver Spring, MD

Frick Refrigeration System and Condenser Replacement
Results
Indian Head, MD 20640

Boiler Overhauls and Preventative Maintenance
Infrastructure
Bidding
Baltimore, MD 21202

Boiler and Hot Water Heater Preventative Maintenance and Repairs
Term Contract
Post-Bid
Salisbury, MD 21804

Water Treatment Maintenance and Service
Term Contract
Results
Baltimore, MD 21202

Furnish and Installation of Walk-In Cooler and Freezer at Mt. Airy Elementary School
Alteration
Bidding
Mount Airy, MD 21771

HVAC and Mechanical Equipment Preventative Maintenance and Repair Frederick Readiness Center
Term Contract
Post-Bid
Less than $50,000 est. value
Frederick, MD 21701

WRAIR, Preventive Maintenance and Service for Water for Injection/Pure Steam/Distribution Systems
Results
Silver Spring, MD 20910

Mechanical / HVAC Job Order Contract
Post-Bid
Salisbury, MD 21802

Arc Melter with Chilled Water Vacuum Suction Casting
Results
Gaithersburg, MD

Reported 01/25/2022 12:00 AM
Project Title

Chiller Maintenance and Overhaul Services for Two Chillers

Physical Address View project details and contacts
City, State (County) Beltsville, MD 20705   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall lock-out tag-out chiller #1 and recover all refrigerant & store per EPA regulations. The contractor shall shut down only one circuit at a time to remove defective compressors A3 & B1. The contractor shall remove one defective compressor and install a new one along with the contactor and control board. The contractor shall vacuum each circuit to 500 microns or less. The contractor shall reassemble the chiller. The contractor shall leak test, evacuate and charge back the refrigerant removed. USDA will provide any additional refrigerant if needed. The contractor shall check, set and adjust all operating & safety controls, check all electrical connections for tightness & calibrate the controls for proper operation of the chiller. Upon completion, the contractor shall clean the site, check the chiller charge and operation per the manufacturer’s recommendations

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents