Similar Projects
Repair Roads for Rebuild
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Tyndall AFB, FL 32403

Paving Improvements
Infrastructure
Bidding
$1,175,000 est. value
Callaway, FL

Front Beach Road Segment 4.1 Powell Adams
Post-Bid
Panama City Beach, FL 32413

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Vermont Avenue Stormwater Improvements
Results
Less than $317,223 est. value
Lynn Haven, FL 32444

Front Beach Road Segment 3 and Highway 79
Results
Panama City, FL

Roadway Rehabilitation Phase V (Major Resurfacing - Local Roads)
Infrastructure
Bidding
$6,446,693 est. value
Panama City, FL

Cherry Street Resurfacing, Sidewalks and Drainage Improvements
Infrastructure
Post-Bid
$500,000 est. value
Callaway, FL

Street Resurfacing Project FY 2021
Results
Panama City Beach, FL 32413

HMA Repaving for TAFB Test Sections
Alteration
Post-Bid
Panama City, FL 32403

Resurfacing
Results
$5,484,117 est. value
FL

HMA Repaving for TAFB Test Sections
Alteration
Post-Bid
Panama City, FL

Wildwood Road Improvements
Results
Less than $422,000 est. value
Panama City Beach, FL 32407

Storm Water Drainage Repair
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Tyndall AFB, FL

S. Silver Lake Road and Silver Lake Road - Dirt Road Stabilization Project
Results
FL 32438

Last Updated 07/12/2022 01:40 AM
Project Title

Cherry Street Improvements Phase I

Physical Address View project details and contacts
City, State (County) P C Beach, FL 32401   (Bay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $370,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the replacement and renovation of the existing water, wastewater, stormwater pipes, stormwater inlets, pavement, curb, and installation of lighting and trees. The limits of the project are Cherry Street from Beach Drive to South Bonita. This project is funded by FDEP-SRF, which has an American Iron and Steel requirement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents