Similar Projects
CTH PF - USH 12 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$750,000 CJ est. value
North Freedom, WI 53951

Reedsburg - Wisconsin Dells Const / Intersection Improvement / RAB
Infrastructure
Conception
$3,000,000 CJ est. value
Loganville, WI 53943

Waldo Street Condominiums
New Construction
Design
$32,000,000 est. value
Baraboo, WI 53913

Ironton - Woodland (CTH G) Constr OPS / Pavement Replacement
Infrastructure
Design
$3,000,000 CJ est. value
Ironton, WI 53941

Reedsburg Area Ambulance Service Sleeping Unit and Day Room Addition
Addition, Demolition, Renovation, Infrastructure - 11,570 SF
Bidding
$2,000,000 CJ est. value
Reedsburg, WI 53959

Rehabilitation of Bridge 368 MP 174.63, Reedsburg Subdivision
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Baraboo, WI 53913

Lake Redstone Swallow Bay Spillway Restoration
Infrastructure
Post-Bid
La Valle, WI

Well Drilling Services
Infrastructure
Post-Bid
WI

Building Demolition and Site Grading
Demolition, Infrastructure
Results
North Freedom, WI

Baraboo and Reedsburg Facilities
New Construction, Infrastructure - 164,640 SF
Results
$10,000,000 CJ est. value
Baraboo, Reedsburg, WI 53913

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Baraboo - IH 90 / 94 Const / Signing / Marking / Curve Pav't
Infrastructure
Conception
$500,000 CJ est. value
Baraboo, WI 53913

Village Forest Park Phase 2 - Pavilion Building
New Construction, Infrastructure
Bidding
$450,000 CJ est. value
Baraboo, WI 53913

Village Forest Park Project - Playground Development
Infrastructure - 2,500 SF
Post-Bid
$540,000 CJ est. value
Baraboo, WI 53913

2021 Vault Toilet Replacement Group 2
Demolition, New Construction, Infrastructure
Results
$278,000 CJ est. value
Baraboo, WI 53913

Last Updated 10/10/2022 01:37 PM
Project Title

Pelton Apartments

Physical Address View project details and contacts
City, State (County) Reedsburg, WI 53959   (Sauk County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of three apartment buildings. In three phases, each phase will be for one of the buildings. As of October 7th, 2022 this project is pending approval of an amended building permit. A general contractor has been confirmed. Construction work is estimated to begin the winter of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3 Stories, 1 Story Below Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents