Similar Projects
Rural Street Underpass Clearance (Construction) - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$6,571,000 CJ est. value
Indianapolis, IN 46218

South Madison Park and Ride - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$2,100,000 CJ est. value
Indianapolis, IN 46204

Culver's - Southern Plaza / Indianapolis
New Construction, Infrastructure - 4,800 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46227

Odd Fellows Building Redevelopment
Build-out - 82,565 SF
Design
$25,000,000 CJ est. value
Indianapolis, IN 46204

Pike High School Planetarium and Interior Renovations
New Construction, Infrastructure
Bidding
Indianapolis, IN 46268

Hilton Motto Hotel Indianapolis
Renovation
Post-Bid
Indianapolis, IN 46204

Lawrence 2022 Sewer and Manhole Rehabilitation
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Lawrence, IN 46226

Krannert Park Family Center - Water Line Replacement
Infrastructure
Results
$88,220 CJ est. value
Indianapolis, IN 46241

Gustafson Park Pool Liner
Infrastructure
Results
$135,420 CJ est. value
Indianapolis, IN 46224

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

Motto by Hilton Hotel / Indianapolis
Renovation
Construction
$21,000,000 est. value
Indianapolis, IN 46204

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

Boxcar Developments Apartments and Hotel
New Construction - 4,800 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Indianapolis, IN 46204

Super Stop 2.0 Alabama, Ft Wayne and Vermont Stations, 2 Each - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$2,617,322 CJ est. value
Indianapolis, IN 46204

Pan Am Plaza Redevelopment Signia Hilton Hotel
Addition, New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Indianapolis, IN 46225

Last Updated 08/16/2023 03:15 PM
Project Title

RFP- Construction Manager as Constructor (CMc) for Terminal Connected Airport Hotel

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46241   (Marion County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Hotel/Motel, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Shortlist Confirmed. Terminal Connected Airport Hotel at the Indianapolis International Airport (IND) (Project No. I-21-060) The IAA is considering the development of a Terminal Connected Airport Hotel located on the west side of the existing Terminal Parking Garage. The current hotel program includes: 1. Approximately 250 keys 2. Full-service restaurant which serves breakfast, lunch and dinner 3. Pool and fitness center 4. Bar/Lounge area 5. Pedestrian passage through the hotel to the garage to serve Park & Walk customers. Pedestrian circulation will most likely include escalators/elevators and bridge to the garage. The bridge is expected to connect at the 3rd Level of the existing parking garage, i.e. uppermost portion of the speed ramp on the west side. The bridge is anticipated to be fully enclosed and terminate at the west exterior façade of the garage. 6. Page 15 of 19 depicts a conceptual level floor plan and elevations of the schematic design of the hotel. These drawings are meant to provide context of the type of hotel that is currently being considered. Additional information (i.e. Schematic Level design and renderings) will be shared prior to the Presubmittal meeting. 7. The RESPONDENT shall be familiar and have relevant experience in Hotel Development for Public Entities and Construction Manager as Constructor (CMc) delivery methods. The objective of this project is to design and construct a new Terminal Connected Airport Hotel Q&A Deadline: 04/21/2023 3:00 PM (EDT)

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Seating, Hospitality Furniture.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents