Last Updated | 08/16/2023 03:15 PM |
Project Title | RFP- Construction Manager as Constructor (CMc) for Terminal Connected Airport Hotel |
Physical Address | View project details and contacts |
City, State (County) | Indianapolis, IN 46241 (Marion County) |
Category(s) | Commercial, Heavy and Highway, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Hotel/Motel, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Shortlist Confirmed. Terminal Connected Airport Hotel at the Indianapolis International Airport (IND) (Project No. I-21-060) The IAA is considering the development of a Terminal Connected Airport Hotel located on the west side of the existing Terminal Parking Garage. The current hotel program includes: 1. Approximately 250 keys 2. Full-service restaurant which serves breakfast, lunch and dinner 3. Pool and fitness center 4. Bar/Lounge area 5. Pedestrian passage through the hotel to the garage to serve Park & Walk customers. Pedestrian circulation will most likely include escalators/elevators and bridge to the garage. The bridge is expected to connect at the 3rd Level of the existing parking garage, i.e. uppermost portion of the speed ramp on the west side. The bridge is anticipated to be fully enclosed and terminate at the west exterior façade of the garage. 6. Page 15 of 19 depicts a conceptual level floor plan and elevations of the schematic design of the hotel. These drawings are meant to provide context of the type of hotel that is currently being considered. Additional information (i.e. Schematic Level design and renderings) will be shared prior to the Presubmittal meeting. 7. The RESPONDENT shall be familiar and have relevant experience in Hotel Development for Public Entities and Construction Manager as Constructor (CMc) delivery methods. The objective of this project is to design and construct a new Terminal Connected Airport Hotel Q&A Deadline: 04/21/2023 3:00 PM (EDT) |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |