Similar Projects
UC Hastings McAllister Tower
Renovation - 641,000 SF
Conception
San Francisco, CA 94102

Helen Baszucki Center for Nursing Excellence School
New Construction
Conception
Less than $3,000,000 est. value
Monterey, CA

San Jose City College Career Education Complex
New Construction, Renovation - 125,000 SF
Design
$112,000,000 est. value
San Jose, CA 95128

UCI Acute Care Hospital
New Construction - 350,000 SF
Design
$10,000,000 CJ est. value
Irvine, CA 92697

Construction and Demolition Debris Disposal and Recycling
Term Contract, Alteration
Bidding
$412,500 est. value
Lancaster, CA 93536

On-Call Tree Maintenance Services
Infrastructure
Post-Bid
$1,800,000 est. value
Oakland, CA

On-Call Citywide Bicycle Parking Installation and Maintenance
Alteration
Post-Bid
$330,000 est. value
Berkeley, CA

Evergreen Valley College Student Services Complex
New Construction - 71,000 SF
Results
$54,700,000 est. value
San Jose, CA 95135

RCD Elevator Modernization
Term Contract
Results
$3,600,000 est. value
Oakland, CA 94612

UC Hastings College of Law Campus Housing
New Construction - 356,000 SF
Construction
$40,000,000 est. value
San Francisco, CA 94102

Porterville College Allied Health Building Project
Renovation
Construction
$14,856,000 est. value
Porterville, CA 93257

UCI Ambulatory Care Center
New Construction
Design
Irvine, CA 92697

Highway Safety Improvement Program Cycle 8 - HSIPC8
Alteration
Post-Bid
$521,283 est. value
Oakland, CA

Fire Department Project Management & Consulting
Alteration
Results
Berkeley, CA

UCI Central Plant
New Construction
Design
Irvine, CA 92697

Last Updated 07/25/2022 12:33 PM
Project Title

RFP - Construction Inspection Services

Physical Address View project details and contacts
City, State (County) Chico, CA 95928   (Butte County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

California State University, Chico is seeking the services of a qualified firm to provide inspection services for the major capital project described below. Duties shall be consistent with the requirements of the 2019 California Building Code and as described herein. Final sequencing and schedule will be coordinated with CSU, Chico and the Contractor. Note: the Firm selected to provide Materials Testing Services for the project will not be selected to provide Construction Inspector Services on that same project. The intent is that, for each project, one firm will provide the IOR and a separate firm will provide the materials testing lab (MTL) services, which typically includes providing special inspectors. The IOR, when not otherwise in demand, will be expected to perform special inspections to minimize unnecessary doubling up on coverage. The California State University, Chico, Behavioral and Social Sciences Building project consists of one building which will serve as a new academic building on campus. The building is steel construction, three stories tall and 95,000 GSF total. Building exterior features include thin brick, aluminum composite metal panels, cast in place concrete, and glazing. The occupied floors are predominantly comprised of classrooms, offices, conference rooms, special instruction rooms, and open collaborative student spaces. Construction is Type II-A, fully sprinklered. The building contains mixed A-2, A-3, F-1, and B occupancies and is a Risk Category III. The project is using the CSU Collaborative Design Build (CDB) process having Turner Construction as the selected DB contractor. The building construction cost is estimated at $76 million dollars and is to be constructed to LEED "Silver", minimum. Construction will begin September 2022 with anticipated completion May of 2024. Should any work under this contract be performed by workers in the classifications covered by prevailing wage laws, they shall be paid not less than the prevailing wage for the craft or work they perform as determined by the Division of Labor Standards Enforcement (DLSE). The prevailing wage obligation applies to working partners, sole proprietors or owner/operators as well as employees of the service provider and its subcontractors. Technical questions or questions regarding RFP submission should be directed to Michael McNairn, Procurement & Contract Services, Email: mjmcnairn@csuchico.edu. The method of Contractor Selection has not been Determined at this time.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents