Similar Projects
2022 CFD T/A Boiler
Alteration
Bidding
Columbus, OH 43207

Water Meter Back Flow Preventer
Post-Bid
Less than $1,380,000 est. value
Columbus, OH

HVAC and Mechanical Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH

J--Cooling Towers - Refurbish/Repair
Results
Columbus, OH 43219

Project CSC-20082 Overhaul AFD on Existing Chillers, Building 23 at DSCC in Columbus, OH, FH 20
Results
Columbus, OH 43218

Walk-In Hayes Freezer/Cooler Replacements at Hayes Intermediate School
Alteration
Post-Bid
$85,000 est. value
Grove City, OH 43123

Energy Efficiency Retrocommissioning
Results
Columbus, OH 43215

Karrer MS Boiler Replacement
Results
Less than $208,000 est. value
Dublin, OH 43016

FCBDD 2021 ECLC Boilers Replacement
Results
$120,000 est. value
Columbus, OH 43214

DOW OPS - 2.5 Gallon Electric Water Heaters
Results
Columbus, OH

Tremont Fountain Improvements
Results
Upper Arlington, OH 43221

UC ECUP Boilers 2 and 3
Alteration
Results
Less than $1,000,000 est. value
Columbus, OH 43224

DLA Building 10 Decentralized Boiler
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Whitehall, OH 43213

CSC-20019; DSCC BLDG 27 Boiler Conversion
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Whitehall, OH 43213

SWWTP Boiler System Operational Improvements
Alteration
Results
Lockbourne, OH 43137

Reported 03/21/2022 11:45 AM
Project Title

Walk-In Cooler Replacements

Physical Address View project details and contacts
City, State (County) Columbus, OH 43224   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $473,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated cost for materials and labor for Group 1 - Columbus Preparatory School for Boys and Independence High School is $181,000.00. The estimated cost for materials and labor for Group 2 – Columbus North International High School and Whetstone High School is $141,000.00. The estimated cost for materials and labor for Group 3 – Medina Middle School and West High School is $151,000.00.

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Coolers.
Division 13 - Special Construction, Controlled Environment Rooms, Cold Storage Rooms, Walk-in Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents