Similar Projects
Aboveground Fuel Tank Inspection and Fuel Oil Filtering
Term Contract
Post-Bid
Kansas City, MO 64128

Aboveground Fuel Tank Inspection and Fuel Oil Filtering
Term Contract
Post-Bid
Kansas City, MO 64128

Fuel Station Maintenance and Repair Services
Infrastructure
Results
Columbia, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Automated Fuel System with Def Dispenser
Results
Joplin, MO

Self Service Fuel Island
Infrastructure
Bidding
Lebanon, MO 65536

Fuel Systems Maintenance Services
Infrastructure
Post-Bid
Saint Louis, MO

Last Updated 10/23/2021 01:34 AM
Project Title

FY22 KC District Fuel Tank Replacement

Physical Address View project details and contacts
City, State (County) Platte City, MO (Clay, Jackson, Platte, Ray Counties)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To Remove Existing Fuel and then Reinstall Removed Fuel once New Tank is Installed at each Location outlined in the Contract. Contractor is Responsible for Removal and Properly Disposing of Existing Fuel Tanks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents