Similar Projects
Sugarloaf Xpress Park and Ride Lot Construction
Infrastructure
Bidding
GA

2021 CDBG Sidewalk Trip Hazard Removal
Alteration
Bidding
Norcross, GA

Col/Wynne Russell-West Johns Sidewalk
Post-Bid
Lilburn, GA

Bona Road Sidewalk Improvements
Post-Bid
Buford, GA 30518

West Jones Bridge Pedestrian Crossing
Results
Peachtree Corners, GA 30092

Downtown Norcross Compactor Enclosure Construction
Results
Norcross, GA 30071

Dacula City Hall Ada Upgrades
Post-Bid
Dacula, GA 30019

SR13 Left Turn Lane Extension
Results
Less than $102,621 est. value
Buford, GA 30515

Paper Mill Road Sidewalk Improvements Project
Post-Bid
Lawrenceville, GA 30246

Clayton Street at Nash Street Parking Lot Project
Results
Less than $382,757 est. value
Lawrenceville, GA 30046

Robin Ridge Drive, Joey Court, and Tecca Court Asphalt Paving Improvements/Sidewalk Project
Post-Bid
Dacula, GA 30019

Multi-Purpose Trail Phase 1
Results
Less than $1,122,112 est. value
Snellville, GA 30039

Provision of Parking Lot and Asphalt Trail Maintenance and Repair on an Annual Contract
Term Contract, Infrastructure
Post-Bid
GA

Pleasant Hill Road (Peachtree Industrial Boulevard to Chattahoochee River) and Boardwalk at the Chattahoochee River Pedestrian Improvement Project
Results
Lawrenceville, GA 30042

Shoe Horn Alley Project
Infrastructure
Post-Bid
Lawrenceville, GA

Last Updated 09/28/2021 02:11 PM
Project Title

Western Gwinnett Pathway Extension Pedestrian Improvement Project

Physical Address View project details and contacts
City, State (County) GA   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Pedestrian Improvement project/contract consists of 4.044 miles of multi-use trail on Peachtree Industrial Blvd, the project includes clearing & grubbing, grading, curb & gutter, sidewalk, multi-use path, asphalt paving, walls, striping, signals and one pedestrian bridge. Earthwork Less than 25,000 CY, Curb & Gutter 17,580 LF, Concrete Flat Work 1,178 SY, Asphalt 6,929 TN, Storm Drain Pipe 9,275 LF.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents