Similar Projects
Last Updated | 06/24/2022 09:50 AM |
Project Title | South Central Regional WWTF Plants 1 & 2 Ras/Was Pump Station Rehabilitations |
Physical Address | View project details and contacts |
City, State (County) | Viera, FL (Brevard County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of Rehabilitation to Plant 1 and Plant 2 at the South Central Wastewater Treatment Facility including, but not limited to replacement of the RAS and WAS pumps, replacement of RAS and WAS piping and valves, adding VFD control to the above-grade flow meters, replacing site lighting, replacing sidewalks, adding additional sidewalks, replacing areas of grass with stone, power washing and sealing concrete pump pads and RAS/WAS splitter boxes, replacing hose bibbs and racks, replacing electrical handhole lids, proving valve cover pads, removing clarifier drain meters and vaults, countersinking pump pad drain covers, enclosing the open polymer area to extend the electrical room, replacing the air conditioning unit, replacing MCCs, and demolishing an eyewash unit; and all other incidentals including demolition necessary to complete the work in accordance with the Contract Documents. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |