Similar Projects
True Storage
New Construction - 60,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Wareham, MA 02576

Hingham Harbor Marina Expansion
New Construction
Conception
Hingham, MA 02043

Amazon Warehouse
Renovation - 149,000 SF
Design
Hingham, MA 02043

Safe Harbor Green Harbor
New Construction, Addition, Demolition
Design
Marshfield, MA 02050

Public Storage #24518
Renovation
Post-Bid
Brockton, MA 02301

Scheduled and Emergency Salt Shed Repairs and Improvements at Various Locations
Results
Less than $450,000 est. value

Pre-Fabricated Metal Building or Wood Pole Building Structure for Cold Storage Facility
New Construction, Demolition
Results
$95,000 est. value
West Bridgewater, MA 02379

Marion Drive Commercial Building
New Construction - 24,000 SF
Construction
Kingston, MA 02364

Davis Commons Community Facility
New Construction - 3,200 SF
Construction
Less than $790,000 est. value
Brockton, MA 02302

Gill Research Road
New Construction - 30,420 SF
Pending Verification
Hingham, MA

Pilgrim Hill Road Redevelopment
Renovation
Pending Verification
Plymouth, MA 02360

Ds Graphics
New Construction - 167,000 SF
Design
$10,000,000 CJ est. value
Rockland, MA

DPW Cold Storage Building
Results
West Bridgewater, MA

Project Eagle
New Construction - 145,000 SF
Construction
$10,000,000 CJ est. value
Kingston, MA 02364

Research Road Warehouse
New Construction
Pending Verification
Hingham, MA 02043

Reported 10/21/2021 12:00 AM
Project Title

Tramp House Building Improvements

Physical Address View project details and contacts
City, State (County) Rockland, MA 02370   (Plymouth County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves roof replacement and structural repairs at the Tramp House, located at 198 Spring Street, Rockland, MA, as shown on the attached plan and specifications. Note that the roof shingles should be 30-year architectural asphalt, and all lumber should be dimensional. It is the Town’s desire to have all work completed by 12/31/2021.

Details

Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents