Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

600 South Sidewalk - 1100 West To 1600 West - City Of Provo
Infrastructure
Conception
$1,000,000 est. value
Provo, UT

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

Rock Canyon Aquifer Storage Transmission Line
Infrastructure
Bidding
$400,000 CJ est. value
Provo, UT 84604

2022 Micro Surfacing Project
Infrastructure
Post-Bid
$400,000 est. value
Orem, UT 84057

RFP Construction Manager - Eagle Mountain Boulevard Widening (CMGC)
Infrastructure
Post-Bid
$9,034,845 CJ est. value
Eagle Mountain, UT 84043

Mill Road Roundabout
Results
$700,000 to $900,000 est. value
Spanish Fork, UT

Redwood Road Trails - Multiple Locations Project
Infrastructure
Results
Saratoga Springs, UT 84045

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

500 East Auto Mall Drive Business Center
New Construction
Construction
American Fork, UT 84003

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

5600 North / University Avenue Traffic Light - City of Provo
Infrastructure
Conception
$2,400,000 est. value
Provo, UT 84604

Sunrise Way Office Building
New Construction - 20,000 SF
Design
Less than $4,500,000 est. value
Lehi, UT 84043

Last Updated 07/10/2023 12:02 PM
Project Title

Edgewood Drive Office Development

Physical Address View project details and contacts
City, State (County) Provo, UT 84604   (Utah County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Zoning Variances, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new commercial office development. Additional scope details have not been determined. As of July 10, 2023, no building permits have been submitted to the City of Provo. A timeline for construction has yet to be announced.

Details

225,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents