Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Underground Electrical Pad-Mount Equipment Inspections and Repair Services
Term Contract
Sub-Bidding
Georgetown, TX 78626

Electrical Maintenance Repair Services for Wichita Falls
Alteration
Post-Bid

Electrical Connection to Portable Building Abilene
Alteration
Post-Bid

Standby Generators
Alteration
Results
$214,998 est. value
Georgetown, TX 78626

Primary Underground Cable
Alteration
Results
Georgetown, TX

Replace High Mast Poles FCI Seagoville
Term Contract
Post-Bid
Seagoville, TX 75159

E-Rate Category 2 UPS Systems
Alteration
Results
Austin, Leander, TX 78641

Statewide Generator Inspection, Preventative Maintenance and Repair Services
Term Contract, Alteration
Post-Bid

North Pump Station - Generator Set Procurement
Alteration
Results
Taylor, TX

Generator Inspection, Preventative Maintenance and Repair Services
Term Contract
Post-Bid

South Main Arts District
Infrastructure, Alteration
Results
$200,000 est. value
Georgetown, TX 78626

Electrical Repair and Maintenance Services
Alteration
Post-Bid
Austin, Bryan, Burnet, Cedar Park, Fredericksburg, Georgetown, Lincoln, Llano, Lockhart, Mason, San Marcos, Taylor, TX 77808

Overhead and Underground Electrical Construction
Alteration
Results
$100,000 est. value
Georgetown, TX

Citywide Generator Maintenance and Repair
Renovation
Post-Bid
$50,000 CJ est. value
Leander, TX 78641

Last Updated 03/15/2023 12:38 PM
Project Title

Old Settlers Park East Side Electrical 2022

Physical Address View project details and contacts
City, State (County) Round Rock, TX 78665   (Williamson County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $454,580 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 15, 2023, construction is underway. An exact timeline for construction has not been confirmed. Bidders shall be responsible for printing or obtaining prints of the aforementioned documents as necessary. The scope of work shall include complete provisions for electrical power distribution to all lighting, devices, appliances, and equipment shown on the construction documents. 1. Provisions include, but are not limited to, all supplies, materials, equipment, tools, and labor. 2. Provisions also include all miscellaneous materials required to complete the work shown including, but not limited to, supports, hangers, raceways, boxes, sleeves, seals, equipment pads, wiring connectors, terminals, labels, signs, and markers 3. The construction documents include all plans, elevations, details, diagrams, schedules, and notes on the drawings and the written specifications including any items mentioned in either the specifications or on the drawings but not in the other. 4. Where used on the plans and in the specifications and where not specifically noted otherwise, the term "provide" and the term "install" shall mean furnish, install, connect, and test. 5. Unless explicitly noted "by others" or "existing", all items shown graphically or specified by notes and details on the plans shall be furnished, installed, connected, and tested as needed.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents