Similar Projects
Canal/Franklin/Main Street Intersection Improvements - City of Nashua
Infrastructure
Conception
Nashua, NH

Main Dunstable Road/Buckmeadow Road Improvements - City of Nashua
Infrastructure, Alteration
Conception
$800,000 est. value
Nashua, NH 03062

Thomas More College of Liberal Arts Campus Improvements
Renovation
Design
Merrimack, NH 03054

Bio-Swales and Bioretention Installation
New Construction
Post-Bid
Meredith, NH

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Site Improvements and MOV Canopy Construction
Infrastructure
Results
$960,000 est. value
Hillsboro, NH 03244

Amanda Howard Park Playground Site Preparation
Infrastructure
Results
Dover, NH 03820

Building Cluster 5, Stormwater Management Improvements 1000 Hilltop Place
Construction
New London, NH 03257

Nansen Ski Jump - Sitework
New Construction
Construction
Milan, NH 03588

Novo Nordisk Compressed Natural Gas Facility and Site Improvements
New Construction
Pending Verification
Lebanon, NH 03784

Improvement of a Section of The Conway Recreation Path
Post-Bid
Conway, NH 03860

Manchester-Boston Regional Airport Cargo Facility Site Preparation and Hangar 6 and 7 Building Demolition
Infrastructure
Results
$1,721,450 est. value
Manchester, NH

Sitework for 2 Retail Buildings
New Construction - 11,225 SF
Construction
Epping, NH 03042

As-Needed Earthwork Repair Services
Term Contract
Post-Bid
Laconia, NH

Lebanon High School Track Improvements Project Contract 1 (Sitework)
Renovation, Infrastructure
Results
Lebanon, NH 03766

Reported 06/15/2022 01:31 PM
Project Title

Taylor Falls and Veternas Bridges Deck Rehabilitation - City of Nashua

Physical Address View project details and contacts
City, State (County) Nashua, NH 03064   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The failure of a bridge can be more disruptive to the traveling public than any roadway element and can also create a safety concern. A 2018 inspection and report by an engineering consultant recommends rehabilitating the decks of these two bridges within the next few years. If left unaddressed, the decks will need to be completely replaced in about 10 years at a significantly higher cost. State aid is unlikely to be awarded within the 10-year timeframe; however, the Town of Hudson will pay for 50% of design and construction costs since they are co-owners of the bridges. As of June 14, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents