Similar Projects
Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

Hilton Archives Expansion
Renovation - 3,787 SF
Bidding
Houston, TX 77204

Renovation at Riverside Historical Buildings for Harris County Precinct 1
Renovation - 20,772 SF
Bidding
$11,000,000 est. value
Houston, TX 77004

University of Houston College of Medicine
New Construction - 133,800 SF
Post-Bid
Less than $72,500,000 est. value
Houston, TX

CMAR UH New Law Center
New Construction - 180,000 SF
Post-Bid
$60,000,000 to $72,000,000 est. value
Houston, TX 77204

UH Hilton College Renovation and Expansion
Renovation
Results
$30,400,000 est. value
Houston, TX

Pathology Frozen Section Lab Renovations Phase 2
Renovation
Results
Houston, TX 77030

Graduate College of Social Work Renovation
Renovation, Addition - 5,000 SF
Construction
$2,300,000 est. value
Houston, TX

Generation Park Academic Building
New Construction - 55,000 SF
Construction
Less than $17,250,000 est. value
Pasadena, TX 77506

BCM Education Space
Renovation
Pending Verification
Houston, TX 77030

Kingwood Campus - Health Professions Center
New Construction - 49,000 SF
Post-Bid
Kingwood, TX 77339

CPET Extended Site Development
Results
$500,000 est. value
Pasadena, TX 77501

Renovate Smith Research Building Construction Manager at Risk
Renovation
Construction
Houston, TX 77054

Melcher Garrison Renovation Project
Renovation - 55,000 SF
Post-Bid
Houston, TX 77000

Chemistry Lab Renovation at Lone Star College Cyfair Main Campus
Renovation
Results
Cypress, TX 77433

Last Updated 06/22/2021 08:32 AM
Project Title

Renovate Endoscopy Center - Main Building - Floor 5

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction projects include the addition of 12 floors that can accommodate more than 300 new inpatient beds in Alkek Hospital on the North Campus; two new research buildings on the South Campus that will house the Center for Advanced Biomedical Imaging Research and Center for Targeted Therapy as part of the McCombs Institute; and MD Anderson's first facility on its Mid Campus, a 25-story building to support current office space and future growth needs.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents