Similar Projects
Disaster Restoration and Water Cleanup
Bidding
Clemson, SC 29634

Removal and Recycling of Tires
Term Contract
Post-Bid
Greenwood, SC 29646

Emergency and Rapid Response Service (ERRS)
Post-Bid

Used Lamp and Ballast Disposal for TTC 2019
Term Contract
Results
Less than $6,124 est. value
Hanahan, SC 29406

Public Works Limb and Brush Debris Pile Removal
Results
Fort Mill, SC

Waste Collection Services
Term Contract
Post-Bid
Columbia, SC 29210

Debris Removal and Disposal
Results
Newberry, SC

Collection/Disposal of E-Waste
Post-Bid
Orangeburg, SC 29115

Monitoring and Management of Debris Removal Services
Results
Newberry, SC

Household Garbage Service
Post-Bid
Saint George, SC

S--766-19-2-604-0067 Non-Hazardous Solid Waste & Recycling, Charleston CMOP
Results
Charleston, SC 29405

Refuse Collection and Disposal Service
Term Contract
Post-Bid
Columbia, SC 29210

Solid Waste Contracted Hauling and Services
Term Contract
Results
SC

Scrap Metal
Post-Bid
Beaufort, SC 29904

County Rock Hauling
Results
Saluda, SC

Last Updated 12/13/2019 03:28 PM
Project Title

Hog Island Trail Hurricane Dorian Clean Up

Physical Address View project details and contacts
City, State (County) Mount Pleasant, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of trees and miscellaneous debris caused by Hurricane Dorian along the Hog Island Trail located in the Patriots Point area of Mount Pleasant, South Carolina 29464. The trail is approximately one mile (1.14 miles) in length and six to eight (6’ to 8’) feet in width. All removal shall be in accordance with FEMA recommendations as to limits of disturbance and proximity of the area. FEMA requires no removal of trees or vegetation to exceed beyond two (2’) feet of both edges of the existing path. A box corridor encompassing no more than two (2’) feet of both edges of path and above through the tree line that would hold tree or vegetative material that could cause a safety issue shall be removed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Planting Preparation, Soil Preparation, Landscape Grading.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents