Similar Projects
Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration
Infrastructure
Conception
$5,356,000 CJ est. value
Custer, SD 57730

Urban Grading, Curb and Gutter, Storm Sewer, Lighting, PCC Surfacing, Sidewalk, Curb Ramps - US 16
Infrastructure
Conception
$21,362,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Sylvan Lake Store Replacement
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Custer, SD 57730

Furnishing Granular Materials For Phase 2 & 3 WWTF Improvements Project - Rebid
Renovation, Infrastructure
Results
$229,790 CJ est. value
Custer, SD 57730

Furnishing Granular Materials For Phase 2 & 3 WWTF Improvements Project - Rebid
Renovation, Infrastructure
Results
$229,790 CJ est. value
Custer, SD 57730

WWTF Improvements Phase 2 - SAGR and UV Disinfection Construction
Infrastructure, Renovation
Post-Bid
$6,500,000 CJ est. value
Custer, SD 57730

Modify Intersection
Infrastructure
Results
$1,338,128 CJ est. value
Custer, SD 57730

Custer County Airport - Hangar Taxilane Extension
Infrastructure
Post-Bid
$725,000 CJ est. value
Custer, SD 57730

WWTF Waste Water Treatment Facility Improvements Phase 3B Transfer Force Main and Lift Station Construction
Renovation, Infrastructure
Results
$2,565,923 CJ est. value
Custer, SD 57730

New Fuel System Department of Transportation
Infrastructure
Post-Bid
$150,000 CJ est. value
Custer, SD 57730

WWTF Wastewater Treatment Facility Improvements Phase 3A Effluent Force Main Construction
Renovation, Infrastructure
Results
$4,162,691 CJ est. value
Custer, SD 57730

Phase I Watermain System Improvements
Infrastructure
Results
$3,423,866 CJ est. value
Buffalo Gap, SD 57722

Last Updated 07/26/2023 10:23 AM
Project Title

Fairburn Water Source Project Schedule 3: Pump Testing & Well Completion

Physical Address View project details and contacts
City, State (County) East Custer, SD 57744   (Custer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes flow testing of one (1) previously constructed artesian water supply well and the completion of the well with submersible pump, pitless unit, and miscellaneous appurtenant work. The flowing well accesses the Madison Formation Aquifer, is approximately 2,314' in total depth, with a shut-in pressure of 77 PSI and 110 GPM artesian flow.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents