Similar Projects
Shaver Road Bridge and Floodwall, Phase 3
Conception
$2,500,000 est. value
Cedar Rapids, IA

Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Bridge Replacement - PPCB
New Construction, Infrastructure
Bidding
IA

L-Bridge
New Construction, Infrastructure
Bidding
IA

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

Bridge Deck Overlay
New Construction, Infrastructure
Post-Bid
IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Bridge Deck Overlay
New Construction, Infrastructure
Bidding
IA

Bridge Replacement - PPCB
New Construction, Infrastructure
Post-Bid
IA

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Replacement - CCS
New Construction, Infrastructure
Bidding
IA

Bridge Replacement - CCS
New Construction, Infrastructure
Post-Bid
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Last Updated 12/22/2021 05:36 AM
Project Title

Bridge Deck Overlay

Physical Address View project details and contacts
City, State (County) IA   (Pottawattamie County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0001 Design No. 0222; 110'-6 x 28'-0 Continuous Concrete Slab Bridge 0002 Design No. 0222; Design No. 0110; Alternate ‘Aa’ Option 1: Class o Pcc, Bid This Section If Alternate ‘Aa’ Option 1 Is Chosen 0003 Design No. 0222; Alternate ‘Aa’ Option 2: Class Hpc- o Pcc, Bid This Section If Alternate ‘Aa’ Option 2 Is Chosen 0004 Roadway Items Route: u.s. 59 Stream 2.4 Mi n Of Ia 92 0.16 Ton Asphalt Binder 349.50 Square Yard Bridge Floor Overlay 69.90 Square Yard Bridge Floor Repair, Class a 1.00 Lump Sum Construction Survey 14.80 Square Yard Engineering Fabric 2.60 Ton Hot Mix Asphalt 309.30 Square Yard Longitudinal Grooving In Concrete 66.83 Station Pavement Markings 31.60 Square Yard Pavement Scarification 6.10 Ton Revetment 650.00 Linear Foot Temp. Barrier Rail 1.00 Each Temp. Traffic Signals

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents