Similar Projects
Replace Two Bladder Tanks and Pumphouse - USDA, ARS
New Construction
Design
Griffin, GA 30223

Mays Crossing Lift Station and Force Main Rehab
New Construction, Infrastructure
Bidding
Stockbridge, GA

Atlanta-Newnan Road Pump Station and Force Main
New Construction, Infrastructure
Bidding
Atlanta, GA

Naval Reserve Center Lift Station
Post-Bid
Columbus, GA

Lee Street Lift Station and Associated Improvements
Post-Bid
Valdosta, GA 31601

Chattahoochee River Intake Pump Station
Results
Atlanta, GA 30303

DOA Sanitary Sewer Lift Stations Operation and Maintenance
Results
Atlanta, GA 30301

Construction of Walnut Creek Lift Station
Construction
Morrow, GA 30260

Water System Improvements - Fort Lamar Elevated Tank and Booster Pump Station
Renovation
Bidding
$2,000,000 est. value
GA

Bloomingdale Regional Utilities
New Construction
Post-Bid
Savannah, GA

Booster Pump Station Replacement
Results
Adairsville, GA 30103

Sea Palms West CIPP Rehabilitation
Infrastructure
Bidding
Brunswick, GA

Sanitary Sewer System Extension
New Construction, Infrastructure
Post-Bid
Less than $500,000 est. value
Lyons, GA 30436

Site Utilities at Highway 24 and Bypass
Results
Waynesboro, GA 30830

S.R. 110 MSW Landfill Leachate Lift Station Construction
New Construction
Post-Bid
Woodbine, GA 31569

Last Updated 08/16/2021 10:21 AM
Project Title

Pump Station Bypass Connections

Physical Address View project details and contacts
City, State (County) Thomson, GA 30824   (McDuffie County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be completed shall consist of furnishing all labor, equipment and materials necessary to provide a bypass pumping system and install eighteen (18) temporary bypass pump connections including, but not limited to fittings, valves, piping, bypass pumping, concrete blocking, earthwork, grassing, soil erosion and sediment control measures, and all appurtenances necessary to provide a complete installation.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents