Similar Projects
Last Updated | 07/06/2022 09:01 AM |
Project Title | B-21 Mission Operations Planning Facility |
Physical Address | View project details and contacts |
City, State (County) | SD (Meade County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility, Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the government with a complete facility and warranty based on the Request for Proposal (RFP). Construct a B-21 Mission Operations Planning Facility (MPF) and a B-21 Field Detachment Training Facility (FTD) on a combined site at Ellsworth Air Force Base (EAFB), South Dakota. The MPF will provide +/- 47,113 SF of secure operations planning space in support of B-21 operations at EAFB. The FTD will provide +/- 57,328 SF of secure maintenance training and classroom space in support of B-21 operations at EAFB and Air Force-wide. The projects will include associated paving, site features, utilities, and infrastructure for operations planning for the emerging B-21 airframe. The project may also include bid options for furniture, furnishing and equipment (FF&E), intrusion detection systems (IDS), access control systems (ACS), uninterrupted power supply (UPS), and closed-circuit television (CCTV) systems. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. The facilities should be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable (green) construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria. Special construction and functional requirements: The project will be constructed near flightline facilities at EAFB. As such, the project may be constructed adjacent to – and may be required to integrate with – active airfield operations. Demolition of existing facilities, utilities, and infrastructure – to include hazardous materials soils may be required. Large portions of the facilities to be constructed and accredited to ICD/ICS 705 criteria. Special oversight of these spaces may be required during construction. |
||||||||||||||||||||||||||||||||||||
Details | ,, 104,441 SF - 1 Misc. Buildings, Approximately 47,113 SF New Construction, 1 Misc. Buildings, Approximately 57,328 SF New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |