Similar Projects
Five Guys / Lebanon
Build-out - 2,500 SF
Design
$390,000 CJ est. value
West Lebanon, NH 03784

Hopkins Center for the Arts - Dartmouth College
Addition, Demolition, Renovation, Infrastructure - 70,000 SF
Design
$88,000,000 CJ est. value
Hanover, NH 03755

Downtown Drainage Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Plymouth, NH 03264

Downtown Drainage Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Plymouth, NH 03264

Police Station Parking Lot Expansion
Infrastructure
Post-Bid
Lebanon, NH 03766

New Secure Entry and Possible Handicapped Accessibility Renovation Project
Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Monroe, NH 03771

2021 Province Road Project
Infrastructure
Results
Groton, NH 03266

2021 River Road Project
Infrastructure
Results
Groton, NH 03266

James W Campion III Rink Expansion
Addition, Infrastructure - 56,570 SF
Pending Verification
$10,000,000 CJ est. value
West Lebanon, NH 03784

Mary Hitchcock Memorial Hospital Emergency Room Expansion
Addition, New Construction, Infrastructure - 13,232 SF
Pending Verification
$2,600,000 CJ est. value
Lebanon, NH 03766

Starbucks Shell - Centerra Marketplace / Lebanon
New Construction, Infrastructure - 2,273 SF
Design
$600,000 CJ est. value
Lebanon, NH 03766

Bartlett Road Reconstruction Contractor
Infrastructure
Post-Bid
$400,000 est. value
Plymouth, NH 03264

34.8 Miles of Pavement Crack Seal
Infrastructure
Results
$290,505 est. value
Campton, Littleton, Woodstock, NH

North End Student Housing
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Hanover, NH 03755

Mount Lebanon Elementary School Renovations - Lebanon School District
Addition, Demolition, Renovation, Infrastructure - 9,800 SF
Post-Bid
$4,000,000 CJ est. value
West Lebanon, NH 03784

Last Updated 01/03/2023 02:32 PM
Project Title

Starbuck TI - Centerra Marketplace / Lebanon

Physical Address View project details and contacts
City, State (County) Lebanon, NH 03766   (Grafton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes a Starbucks fit-out at a shopping center. Construction on the shell building is expected to begin summer 2023. Construction on the interior fit-out is expected to begin fall 2023.

Details

1 Story Above Grade, 2,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents