Similar Projects
Reported | 04/30/2021 12:00 AM |
Project Title | Highway Department Maintenance Facility - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Carthage, MO (Jasper County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines, Pumps and Wells, Sanitary Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Section A project generally consists of installing low-pressure pipe (LPP) septic system, including pumps, tanks, electrical conduit, miscellaneous electrical equipment, 4-inch diameter septic lines, and lateral absorption field. Section B project generally consists of installing a 3,000-gallon liquid propane (LP) tank, 1.5-inch diameter LP line, and tank connection to pad. Section C project generally consists of a 10,000-gallondiesel tank, 3,000-gallon unleaded fuel tank, diesel exhaust fluid (DEF) tank, miscellaneous pumps, fuel lines, and electrical equipment. Section D project generally consists of the installation of security fencing and entrance gates. Section E project generally consists of the installation of various waterlines, gate valves, 2-inch diameter flush hydrant, testing, drilling, and installing a 800-foot deep non-transient non-community water well along with the installation of a submersible pump, and pit less adapter. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |