Description |
As of June 14, 2023, the project has not been awarded. A timeline for award has not been confirmed. Removals:
1. Removal existing wall grills serving
GYM/Auditorium.
2. Removal existing convector covers serving basement, 1st floor, & 2nd floor.
3. Removal existing grille and associated ductwork up to corridor and cap at 1st floor, & 2nd floor.
New Work:
1. Provide new grilles for radiation at GYM/Auditorium.
2. Reinstall existing convector covers. Scrape, prime and paint exist cover to match new room finish. Provide new custom 14 gage convector covers, field measured exact cover dimension and provide cover installation. Provide vacuum cleaning of existing heating element.
3. Provide thirteen (13) split AC system complete with controls, refrigerant piping, insulation, support for each of the following rooms: 120D guidance conf rm, 118 resource rm, 112 resource rm, 107 telecom room, 105A warming pantry, 105B food
STG, 218 staff lunch/conf, 212 resource rm, 214 resource rm, 205A warming pantry, 205B food STG, 203A MED office, & 201 supv office.
4. Provide roof top exhausters for locker room, refuse room warming pantry, & toilet exhaust. The units shall be complete with starters and time clocks, registers/grilles, ductwork, curbs, access doors. Provide all required control wiring and conduit.
5. Provide standalone controls including, electronic thermostat, all required control wiring and conduit for each new HVAC system.
6. Provide all required testing, air balancing, start up. Location- 1514 72nd Street, Brooklyn, NY 11228 |
Details |
Division 01 - | General Requirements, Construction Facilities. | Division 03 - | Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection. | Division 08 - | Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents. | Division 09 - | Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting. | Division 10 - | Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles. | Division 11 - | Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures. | Division 12 - | Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating. | Division 21 - | Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems. | Division 22 - | Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods. | Division 25 - | Integrated Automation. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting. | Division 27 - | Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems. | Division 28 - | Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm. | Division 31 - | Earthwork, Common Work Results for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment. | Division 32 - | Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses. | Division 33 - | Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities. |
|