Similar Projects
Lakeview Pumping Station - Electrical and Control Improvements - 39131 - City of Chicago
Renovation
Conception
$2,372,566 est. value
Chicago, IL 60640

Pump House Improvements - Village of Lincolnwood
Renovation, Infrastructure
Conception
$365,700 CJ est. value
Lincolnwood, IL 60712

Lift Station Rehabilitation - Bode Road - Village of Schaumburg
New Construction
Design
$350,000 est. value
Schaumburg, IL 60194

Pump Station 16 Standby Generator and MCC (Motor-Control Center) Replacement
Renovation
Design
$300,000 CJ est. value
Arlington Heights, IL 60004

Hicks and Dundee Monopole
Renovation
Post-Bid
Arlington Heights, IL

Menominee Lift Station Rehabilitation
Renovation
Post-Bid
Palos Heights, IL

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

Cottonwood Relief Station Rehabilitation
Results
Mount Prospect, IL

Lagrange Highlands Sanitary District Pump Station Improvements
Renovation
Post-Bid
$236,000 est. value
La Grange, IL 60525

Harlem Avenue Lift Station Improvements
Results
Chicago Ridge, IL 60415

107th Street Pump Station Improvements
New Construction
Results
Chicago Ridge, IL 60415

Terrace Court Stormwater Pump Station Improvements
Renovation
Results
Glencoe, IL

Rehabilitation of Raw Sewage Pump Rotating Assemblies at Various Locations
Renovation
Results
$1,530,000 est. value
Chicago, IL

Tinley Park Post 5 Lift Station Improvements
Renovation
Results
Tinley Park, IL 60487

Lift Station Rehabilitation
New Construction
Results
Arlington Heights, IL

Last Updated 08/01/2022 12:01 AM
Project Title

Replacement of Condensate and Sump Pump - Must be Pre-qualified Various Trades Vendors Only

Physical Address View project details and contacts
City, State (County) Chicago, IL 60628   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. Replacement of Condensate and Sump Pump Provide supervision equipment materials and skilled labor to perform the following Condensate Return pump replacement: Contractor to remove and replace existing condensate return pump assembly, including collection basin, pumps, piping and valving, controls and power. Provide new local disconnect switch for new assembly located high on wall within space. All electrical enclosures to be NEMA 4 rating. See attached standard detail and specification for additional details. New assembly to match existing in flow rate, head pressure and electrical characteristics. Sump Pump replacement: Contractor to remove existing sump pump and replace with new sump basin and assembly. Provide new local disconnect mounted high on wall within space. All electrical enclosures to be NEMA 4 rating. See attached standard detail and specification for additional details. New assembly to match existing in flow rate, head pressure and electrical characteristics. New basin to be provided within existing floor opening, with connection to existing underground pipes. Rod out all entries to the new sump assembly. If building or CPS properties are damage during construction, contractor to replace and or repair as necessary. All questions/request must be received two business prior to bid closing. All work shall be coordinated with the board authorize representative to complete in a greed upon time frame. Contractor crew is to remove and dispose of materials torn out and any construction debris. All trash must be roved off-sight by vendor and area left clean. All work to be completed according to CPS Specifications.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents