Similar Projects
Last Updated | 08/01/2022 12:01 AM |
Project Title | Replacement of Condensate and Sump Pump - Must be Pre-qualified Various Trades Vendors Only |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60628 (Cook County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $70,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid. Replacement of Condensate and Sump Pump Provide supervision equipment materials and skilled labor to perform the following Condensate Return pump replacement: Contractor to remove and replace existing condensate return pump assembly, including collection basin, pumps, piping and valving, controls and power. Provide new local disconnect switch for new assembly located high on wall within space. All electrical enclosures to be NEMA 4 rating. See attached standard detail and specification for additional details. New assembly to match existing in flow rate, head pressure and electrical characteristics. Sump Pump replacement: Contractor to remove existing sump pump and replace with new sump basin and assembly. Provide new local disconnect mounted high on wall within space. All electrical enclosures to be NEMA 4 rating. See attached standard detail and specification for additional details. New assembly to match existing in flow rate, head pressure and electrical characteristics. New basin to be provided within existing floor opening, with connection to existing underground pipes. Rod out all entries to the new sump assembly. If building or CPS properties are damage during construction, contractor to replace and or repair as necessary. All questions/request must be received two business prior to bid closing. All work shall be coordinated with the board authorize representative to complete in a greed upon time frame. Contractor crew is to remove and dispose of materials torn out and any construction debris. All trash must be roved off-sight by vendor and area left clean. All work to be completed according to CPS Specifications. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |