Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Last Updated 07/27/2020 11:40 PM
Project Title

Install Three New AC/Heating Units

Physical Address View project details and contacts
City, State (County) Lockport, NY 14094   (Niagara County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope Includes the Following: Provide prevailing wage labor for project duration. Provide and install (1) LG multi zone heat pump system. System to be comprised of: (1) 30,000btu DFS LMU30CHV condensing unit to be installed in lower crawl space on 24” stand. Units to be mounted on interior walls. (1) 9,000btu DFS LSN090HSV5 high wall mounted evaporator to serve new office. (1) 9,000btu DFS LSN090HSV5 high wall mounted evaporator to serve expanded nurses office. (1) 12,000btu DFS LSN120HSV5 high wall mounted evaporator to serve nurses office. Provide and install insulated copper refrigerant piping from evaporators to condensing unit. Linesets to be run exposed on interior wall and covered in exposed areas with line hide. Provide and install drain piping to nearest drain. Provide and install power/comm wire from evaporators to condensing unit. Provide and install (3) wired controllers. Provide line voltage power wiring from nearest panel approx. 60’) in hallway. Check, test and startup.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents