Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Lower Veteran's Park - Pickleball Courts
Infrastructure
Bidding
$79,000 CJ est. value
Peoria, IL 61602

Lower Veteran's Park - Pickleball Courts
Infrastructure
Bidding
$79,000 CJ est. value
Peoria, IL 61602

ADA Sidewalk
Post-Bid
Chillicothe, IL

Seal Coat
Alteration
Post-Bid
Princeville, IL

Asphalt Path Replacement at Rock Island Greenway
Results
Peoria, IL

Construction of Rock Island Trail Extension
Results
Peoria, IL 61603

Concrete Paved Ditch Improvements
Infrastructure
Bidding
$296,000 CJ est. value
Hollis Township, IL 61607

2021 North Valley Sidewalk Improvements
Alteration
Post-Bid
Peoria, IL

Warehouse Parking Lot Resurfacing
Results
$104,613 est. value
Peoria, IL

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Medina Township, IL 61523

Second Street ADA Sidewalk
Infrastructure
Post-Bid
Chillicothe, IL 61523

Bituminous Materials And Seal Coat
Results
Less than $36,290 est. value
Brimfield, IL

Nebraska Corridor Upgrade
Infrastructure
Post-Bid
Peoria, IL

Last Updated 09/29/2022 06:02 PM
Project Title

Peoria Public Schools - Harrison Community Learning Center Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Peoria, IL 61605   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 29 2022, the project has been awarded but awarded company not confirmed.** Sidewalk Improvements - PPS Harrison Community Learning Center project, for the purchase and installation of new exterior sidewalks, including labor, tools, equipment, materials, and services for construction and completion of this project as set forth in the Contract Documents Every bid shall be accompanied by a bid security consisting of a bid bond or certified check made payable to the Owner, in the amount of 5% of the bid sum. Commencement of the work on the project shall be subject to the discretion of the Owner. The Owner reserves the right to waive any irregularities and to accept any or reject all bids when in the opinion of the Owner, such action will serve the best interest of the Owner. The Owner anticipates award of the contract within thirty (30) days of the receipt of bid. No bid shall be withdrawn for thirty (30) days after opening of bids without consent of the Owner. Bids on all work of the contract shall be subject to the provisions of the "Illinois Prevailing Wage Act" (Illinois Revised Statutes 48, Section 395S-1-12). Request for Additional Information should be directed in writing to PCM+Design Architects by email to rmcmorrow@pcmplusd.com.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents