Similar Projects
Gisler Avenue Landscape Improvements - City of Costa Mesa
Infrastructure, Alteration
Conception
$350,000 est. value
Costa Mesa, CA 92626

Water Treatment Plant A Filter Valves Replacement - 7702 - City of Antioch
Renovation
Conception
$1,974,000 CJ est. value
Antioch, CA 94509

Poppy Grove Apartments
New Construction, Infrastructure
Design
$145,000,000 CJ est. value
Elk Grove, CA 95757

MPA Route 140 Pavement Preservation
Infrastructure
Design
$24,126,000 CJ est. value
Mariposa, CA 95338

Pittsburg High School New Softball Field
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

Water Reclamation Facility No. 2 Odor Control and Flow Equalization Project
Renovation
Post-Bid
$8,500,000 CJ est. value
Corona, CA 92879

Newcastle Cemetery - Tank Project
Infrastructure
Post-Bid
$500,000 est. value
Newcastle, CA 95658

La Crescenta East and West Reservoir Rehab and Coating Project
Renovation, Alteration
Results
$900,000 est. value
Glendale, CA 91214

Construction of Kern Sanitation Authority Digester System Expansion
New Construction
Results
$6,976,000 est. value
Bakersfield, CA 93314

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Major League Soccer Railyards Stadium
New Construction, Infrastructure - 400,000 SF
Pending Verification
$350,000,000 CJ est. value
Sacramento, CA 95811

Ventris Place Subdivision
New Construction, Infrastructure
Pending Verification
$14,400,000 CJ est. value
Sacramento, CA 95823

Main Library Remodel - 16-08 - City of Palm Springs
Demolition, Build-out, Infrastructure
Conception
$9,738,000 CJ est. value
Palm Springs, CA 92262

Pavement Cold Plane and Overlay
Infrastructure
Design
$21,415,000 CJ est. value
Los Angeles, CA 91504

Last Updated 09/20/2022 08:03 AM
Project Title

Well 17 Treatment Plant and Storage Tank Project

Physical Address View project details and contacts
City, State (County) Marysville, CA 95901   (Yuba County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $12,775,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the Phase I and Phase II Contract Drawings and Contract Documents. Improvements under Phase 1 include the furnishing of all labor, materials and equipment for the provision and installation of a vertical turbine well pump and motor, the construction of concrete well pad, well drain manhole, well discharge piping, and the provision of temporary power and temporary hose connection during testing, and associated work as shown on the Drawings. Phase II includes the furnishing of all labor, materials and equipment for construction of improvements to Well 17 site and water storage tank site including an aerator system and sump, chlorinated water booster pump station, a pressure filter water treatment system and controls, a backwash tank, a CMU Chemical/Control Building with electrical equipment and an on-site hypochlorite generation system, a 1.0-MG water storage tank and a filtered water pump station, a pre-engineered Electrical Building, diesel engine generators, motor control centers, a PLC-based control system with a new cloud-based SCADA monitoring of facility, instrumentation, site piping and filtered water piping between Well 17 site and water storage tank site, site improvements including chain link fence and CMU wall systems, site grading, paving, drainage, and associated work as shown on the Drawings and as described in the Contract Documents. The project will be funded in part by the California Drinking Water State Revolving Fund Program (DWSRF). Disadvantage Business Enterprise (DBE) participation is encouraged.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents