Similar Projects
Woodford Pump Station Replacement - City of Hoover
Renovation
Conception
$515,000 CJ est. value
Hoover, AL 35226

Raw Water Intake, Pump Station, and Plant Modifications
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Lafayette, AL 36862

Foley Beach Express (FBE) Extension Water Main Relocation
Infrastructure
Bidding
$700,000 CJ est. value
Orange Beach, AL 36561

Cedar Creek Booster Generator Project
Renovation
Sub-Bidding
$600,000 CJ est. value
Trussville, AL 35173

Campus Area Water Distribution System and Instrumentation Upgrades - Proposal "C" Project
Post-Bid
Tuscaloosa, AL

Primary Lift Station Improvements
Renovation
Post-Bid
Reform, AL

Baltzell Lift Station Elimination
Results
Anniston, AL 36202

Econchate WPCP 2020 Improvements Project
Results
$22,996,000 est. value
Montgomery, AL

Fort Morgan Road Sewer Improvements - Marina Lift Station and Peninsula Lift Station
Renovation
Construction
Gulf Shores, AL 36547

Abandonment of Water Supply Well No. 4
Infrastructure
Construction
$50,000 CJ est. value
Enterprise, AL 36330

Lift Station No. 68 Capacity Upgrades
Renovation, Infrastructure
Bidding
$4,000,000 CJ est. value
Tuscaloosa, AL 35401

Lift Station 1 Improvements Phase 2
New Construction
Post-Bid
Guntersville, AL

Leeds Parkway Drive Pump Station SSO Abatement
New Construction
Results
$6,900,000 to $7,400,000 est. value
Leeds, AL

Patton Creek No. 1 and No. 2 Pump Station Improvements
Renovation, Infrastructure
Bidding
$6,000,000 CJ est. value
Birmingham, AL 35233

Crenshaw Street Lift Station and Force Main Upgrades
New Construction, Infrastructure
Post-Bid
Mobile, AL 36606

Last Updated 11/03/2022 11:22 AM
Project Title

Sturbridge Sanitary Sewer and Pump Station Abandonment

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36104   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $541,444 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major components: 1. Installation of approximately 1,230 LF of 12-inch sanitary PVC SDR-26 pipe 2. 4 EA sanitary manholes 3. Demolition of one Pump Station Contract Documents for the Project may be viewed and downloaded by electronically. The digital documents can be downloaded for a non-refundable charge of $15.00. The OWNER will only accept Proposals from contractors duly licensed by the Alabama State Licensing Board for General Contractors as required by applicable Alabama law, including without limitation Ala. Code 34-8-1, et seq., BIDDERS' Alabama General Contractor License Number shall appear on the outside of the envelope containing such bid prior to opening 130 CONSECUTIVE CALENDAR DAYS

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents