Similar Projects
Southern Region Disaster Recovery Support BPA
Results

Paving of County Roads
Term Contract
Results
Palestine, TX 75801

Hot Mix
Results
$276,000 est. value
TX

2021 Group Seal Coat Program
Results

Lamar Street Resurfacing
Infrastructure
Post-Bid
Palestine, TX

Highland Drive Resurfacing
Infrastructure
Post-Bid
Palestine, TX 75801

Trails of Katy Section 6 Paving
Infrastructure
Results
TX

148079 Newton County 2020 TDA CDBG County Roads Project
Term Contract, Infrastructure
Results
$200,000 est. value
TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

US0079 - Hot Mix
Infrastructure
Results
$240,600 est. value
TX

Palestine Campus - South Armory Road Extension
Infrastructure
Results
$184,500 est. value
Palestine, TX 75803

SH 19 - Seal Coat
Infrastructure
Results
$12,631,781 est. value
TX

2021/2022 Farmer's Market Asphalt Resurfacing
Infrastructure
Post-Bid
Palestine, TX 75801

Sunterra Sections 18, 19, and 20 Paving Facilities
Infrastructure
Results
$887,000 est. value
TX

Construction of Fallbrook Dive Street Dedication, Section 2 Storm Sewer Facilities, and Reinforced Concrete Paving
Infrastructure
Bidding
TX

Last Updated 02/24/2022 12:11 PM
Project Title

Paving of County Roads

Physical Address View project details and contacts
City, State (County) TX   (Anderson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Paving county roads, blading county roads, base stone, iron ore gravel, corrugated metal culvert pipe, road oil (refined) cracked fuel oil, asphalt treated road material, bituminous cold patch material, asphaltic concrete hot mix, high performance cold mix asphalt patch material, recycled asphalt product, gasoline and diesel fuel, pug mill mixing, railroad tank car culverts and flatbed cars, new and used steel pipe and hauling materials for the year beginning January 1, 2022 through December 31, 2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents