Similar Projects
UFSA Flooring - Stations 106 and 252
Bidding
Eagle Mountain, Salt Lake City, UT 84005

UFSA Flooring - Stations 106 and 252
Bidding
Eagle Mountain, Salt Lake City, UT 84005

The Inn Between Cement Walkway
Post-Bid
Salt Lake City, UT 84105

Midway City Town Hall and Community Center Flooring
Post-Bid
Midway, UT 84049

Cast-In-Place Concrete Wall Repair
Results
$1,000,000 to $1,500,000 est. value
Kaysville, UT

Copper Hills Elementary School, Remove and Replace Concrete
Results
$20,000 to $30,000 est. value
Magna, UT 84044

Fair Grounds
Bidding
Paragonah, UT 84760

Park Building Basement Structural Repairs
Post-Bid
Less than $500,000 est. value
Salt Lake City, UT 84112

Small Concrete Projects
Results
Less than $8,563 est. value
Bluffdale, UT 84065

Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range Phase II
Bidding
Salt Lake City, UT 84128

Wilsonart Solid Surface Sheets
Term Contract
Post-Bid
Farmington, UT 84025

Class 4000 and 5000 Concrete
Term Contract
Results
Less than $40,000 est. value
West Jordan, UT 84088

Edge of Cedars Visitors Center Carpet
Bidding
$148,000 est. value
Ballard, UT

Hospital Kitchen Flooring Replacement, Building 522
Post-Bid
Less than $358,562 est. value
Salt Lake City, UT

Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range
Results
Salt Lake City, UT

Last Updated 09/28/2020 11:11 AM
Project Title

Mill Creek Sediment Basin Concrete Floor Project

Physical Address View project details and contacts
City, State (County) Farmington, UT 84025   (Davis County)
Category(s) Single Trades
Sub-Category(s) Concrete, Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Build a new sediment Basin west of 1100 West in West Bountiful on Mill Creek. We would like to put a concrete floor in the proposed basin. Construction of the floor and ramp into the new basin. The proposed floor must be six inches of concrete reinforced with welded wire mesh placed on eight inches of structural fill and twelve inches of rock. The ramp must be constructed out of eight inches of concrete reinforced with #4 bar 8” O.C. The basin is roughly 95’ wide and 300’ long.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents