Project Title | Mill Creek Sediment Basin Concrete Floor Project |
Physical Address | View project details and contacts |
City, State (County) | Farmington, UT 84025 (Davis County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete, Flooring |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Build a new sediment Basin west of 1100 West in West Bountiful on Mill Creek. We would like to put a concrete floor in the proposed basin. Construction of the floor and ramp into the new basin. The proposed floor must be six inches of concrete reinforced with welded wire mesh placed on eight inches of structural fill and twelve inches of rock. The ramp must be constructed out of eight inches of concrete reinforced with #4 bar 8” O.C. The basin is roughly 95’ wide and 300’ long. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |