Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

RFP - 1367 West Sherman Redevelopment
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Muskegon, MI 49441

Regional A-E Survey and Mapping Services Multiple Award Task Order Contract
Term Contract
Post-Bid
$25,000,000 to $3,500,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

National Guard Bureau, Region 2, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Results
$75,000 to $40,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Grand Region As-Needed Geotechnical Services
New Construction
Post-Bid

Last Updated 01/13/2023 11:12 AM
Project Title

Muskegon Correctional Facility - Various Roof Restorations/Replacements

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49442   (Muskegon County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected August 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 13, 2023, a design firm has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: On behalf of the Michigan Department of Corrections (MDOC), the Department of Technology, Management, and Budget (DTMB) is requesting professional architectural and engineering services for the design, bidding, and construction administration of roof-system replacements of various buildings at the Muskegon Correctional Facility. This request is to provide Phase 300 Schematic Design, Phase 400 Preliminary Design, Phase 500 Final Design, Phase 600 Construction Administration/Office, and Phase 700 Construction Administration/Field Inspection Services. Buildings included in this scope are: the Administration Building, Vocational/Academic Building, Power House/Heat Plant, Maintenance and Storage Building, Admissions Building (with Health Care Wing), five Housing Units, and six Guard Towers. The campus has a variety of roofing systems, including pitched-roof metal panels and low-slope roofing. Existing roof decking, insulation and roof venting methods vary among the buildings. The existing roofing systems appear original to the buildings, which date from the mid1970s. Please see attached Building List for buildings included in the scope of this request. Building List provides building name, approximate construction date, existing roofing material, and approximate building area. Depending on the project location, individuals may be required to wear masks to attend meetings and for a firm to be eligible to submit bids / quotations / proposals. Bring and be prepared to wear a mask if required upon arrival. Requirements may change at any time and any updated guidance must be followed. All buildings require complete roofing system removal and replacement. The PSC will evaluate all existing roofing materials, roof decking, insulation, and venting systems for each building, and provide recommendations for improvement/repair/replacement options for roofing materials, roof decking, insulation and venting of the roofing system(s) of each building. This project will comply with all codes, standards, regulations, and workers' safety rules that are administered by federal agencies (EPA, OSHA, and DOT), state agencies (DCH, EGLE, DNR, and MIOSHA), and any other local regulations and standards that may apply. Please do not submit online questions via VSS. ALL questions should be emailed to Heather DeKorte at dekorteh@michigan.gov no later than Wednesday, August 17, 2022, at 5:00 PM

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents