Similar Projects
Stark and Hogan TIF - 520500 - City of Gresham
Infrastructure
Conception
$1,170,789 CJ est. value
Gresham, OR 97030

Gradin Sports Park Development - CIPPK00001 - City of Gresham
New Construction, Infrastructure
Conception
$4,540,020 CJ est. value
Gresham, OR 97080

Modera Main Street / Portland
New Construction, Infrastructure
Design
$128,000,000 CJ est. value
Portland, OR 97205

Portland Proper Hotel
New Construction, Infrastructure - 170,000 SF
Design
$50,000,000 CJ est. value
Portland, OR 97209

South Portland - Burlingame Phase II Sewer Rehabilitation Rebid
Infrastructure
Bidding
$8,697,638 CJ est. value
Portland, OR 97204

SW Barbur BLVD: SW Caruthers ST - SW Capitol HWY
Infrastructure
Bidding
$1,000,000 CJ est. value
Portland, OR 97219

Dpt Drilling Services In Portland
Infrastructure
Post-Bid
Portland, OR

Naval Operational Support Center (NOSC)
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Portland, OR 97217

Latourell Creek Bridge
New Construction, Infrastructure
Results
$950,000 to $1,050,000 est. value
Corbett, OR 97019

I-84: Corbett Interchange-Multnomah Falls Section of the Columbia River Highway (Rt. No. I-84)
Infrastructure
Results
$100,000 to $500,000 est. value
Corbett, OR

SE Lambert Street and 19th Avenue - City of Portland
Infrastructure
Construction
$2,553,920 CJ est. value
Portland, OR 97201

58th Drive Industrial Building
New Construction, Infrastructure - 1,848 SF
Pending Verification
$1,000,000 CJ est. value
Portland, OR 97206

240 SE Grand Ave Residential Building
New Construction, Infrastructure - 120,000 SF
Pending Verification
$34,000,000 CJ est. value
Portland, OR 97214

Glisan Street: 82nd-162nd, Northeast - City of Portland
Infrastructure
Conception
$1,255,910 CJ est. value
Portland, OR 97230

I-5: Marquam Bridge - Capitol Highway
Infrastructure
Design
$6,898,550 CJ est. value
Portland, OR 97217

Last Updated 12/29/2022 10:02 AM
Project Title

RFP Construction Manager - Hollywood Transit Center

Physical Address View project details and contacts
City, State (County) Portland, OR 97201   (Multnomah County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status No longer Accepting Requests, Construction start expected December 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://djcoregon.com/news/2022/12/19/contractor-chosen-for-transit-center-renovation/ TriMet's board of directors has selected Raimore Construction as the general contractor for the Hollywood Transit Center infrastructure improvement project. ____________________________________________________________________________________________________________________________________ The Tri-County Metropolitan Transportation District of Oregon (TriMet) is soliciting Proposals from qualified general contractors to provide Construction Manager/General Contractor (CM/GC) Services including both preconstruction services and construction services work for the Hollywood Transit Center (HTC) Project. No proposal security will be required. A 100% performance bond and 100% labor and material payment bond on TriMet bond forms will be required when construction services are added to the contract (via a contract modification). The proposal must incorporate and address how elements of the M/W/E/SDVBE program, as described below, will be implemented for both pre-construction and construction activities. It is the policy of TriMet that Minority-owned Business Enterprises, Women-owned Business Enterprises, Service-Disabled Veteran-owned Business Enterprises, Emerging Small Businesses, and Disadvantaged Business Enterprises, certified by the State of Oregon as MBE/WBE/SDVBE/ESB/DBE (Certified Small Businesses) shall have an equal opportunity to participate in the performance of contracts financed with general funds. By submitting its proposal, proposer certifies that it will take all necessary and reasonable steps to ensure that Certified Small Businesses firms are given an equal opportunity to compete for and participate in the performance of this Contract. Proposer further certifies and agrees that it has not and will not discriminate on the basis of race, color, national origin, or sex in the award of subcontracts under this Contract or in performance of this Contract. TriMet views adherence to Appendix F as an important mechanism for meeting this policy objective. TriMet's goal for utilization of Certified Small Businesses is 20%; TriMet strongly encourages proposers to do their best to meet this goal. This section of the proposal shall contain narratives for workforce diversity and M/W/E/SDVBE utilization as more fully described below. The narratives should include identification of Offeror's certifications and/or nondiscrimination practices, and any historical M/W/E/SDVBE joint ventures, subcontracting, or mentoring plans congruent with TriMet's diversity policies. Question Submission Close Date 10/21/2022 12:00 PM PDT

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents