Similar Projects
Traffic Signs
Term Contract
Bidding
Harrisburg, PA

Bus Stop Signage Installation Services
Post-Bid
$200,000 est. value
PA

Wayfinder/Dibond Signage
Term Contract
Post-Bid
Pittsburgh, PA

Installation of Pedestrian Crosswalks
Results
State College, PA

Breakaway Sign Posts and Assemblies
Results
Erie, PA 16500

Barrier Concrete 52 Double
Post-Bid
Harrisburg, PA 17106

New Digital Sign at The Westmont Hilltop Elementary School
Results
Johnstown, PA 15905

Outdoor Digital Sign Replacement for Chester County Library
Post-Bid
Exton, PA 19341

2019 Paving and Commerce Boulevard Striping Project
Results
Dickson City, PA 18519

Traffic Marking Compounds
Term Contract
Post-Bid
Philadelphia, PA 19102

Installation of Durable Pavement Markings
Results

Guide Rail Improvements Bridges 32C, 48A, 55B, and 73B
Results
Reading, PA 19600

Flares, Roadway Safety
Results
Everett, Gibsonia, Middletown, Plymouth, PA 15044

Bollard Project at High School and Elementary School
Results
Houtzdale, PA 16651

Roadway Line Striping
Results
Carlisle, PA

Last Updated 06/22/2020 04:06 PM
Project Title

Bus Stop Signage Installation Services

Physical Address View project details and contacts
City, State (County) Allentown, PA 18103   (Lehigh County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Removing existing bus stop sign, while leaving the channel and breakaway in place, and installing new sign on the existing channel. 2. Installing new breakaway and channel in concrete/asphalt and installing new sign on new channel 3. Installing new breakaway and channel in grass/dirt/gravel and installing new sign on new channel. 4. Installing new sign on an existing channel 5.Installing new sign on a utility pole. 6. Installing new sign on a pedestrian light pole or other metal pole using brackets. 7. Replacing damaged upper channel on existing breakaway and installing new bus stop sign. 8. Replacing damaged breakaway in grass/dirt/gravel, reinstalling existing upper channel and installing new bus stop sign. 9. Replacing damaged breakaway in concrete/asphalt, reinstalling existing upper channel and reinstalling bus stop sign 10. Removing existing bus stop sign only from current channel or utility pole 11. Removing existing bus stop sign and accompanying breakaway and channel from grass/dirt/gravel. 12. . Removing existing bus stop sign, breakaway, and channel from concrete/asphalt and patching concrete as necessary to ensure an even surface in place of the breakaway. 13. Installing vinyl “Bus Stop Bag” covers (provided by LANTA) over new / existing bus stop signs and securing to U-channel via zip tie. 14. Removing vinyl “Bus Stop Bag” covers from bus stop signs 15. Applying a vinyl route logo decal to an existing bus stop in the field and/or applying reflective patch over a route decal on a bus stop sign in the field. 16. Applying bus stop ID numbers and route logo decal on new signs to be installed 17. Hourly rate for emergency repair of bus stop sign or shelter

Details

Division 10 - Specialties, Signage.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents