Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Stockyards Industrial Development
New Construction, Infrastructure
Design
West Fargo, ND 58078

New Paving Construction
Infrastructure
Bidding
$1,350,815 CJ est. value
Fargo, ND 58102

New Paving Construction
Infrastructure
Bidding
$1,350,815 CJ est. value
Fargo, ND 58102

Traffic Signal Installation
Infrastructure
Sub-Bidding
$260,000 CJ est. value
West Fargo, ND 58078

Traffic Signal Installation
Infrastructure
Sub-Bidding
$260,000 CJ est. value
West Fargo, ND 58078

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

New Paving and Utility Construction Improvement
Post-Bid
$1,341,041 est. value
Fargo, ND

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Grading, Aggregate Base Course, RCB Installation and Incidentals on 76th Avenue South
Results
Fargo, ND 58104

Sports Complex - Fargo Park District
New Construction, Infrastructure
Construction
$77,000,000 CJ est. value
Fargo, ND 58104

Interstate 94 / Fire Station - City Of West Fargo
New Construction, Infrastructure - 30,000 SF
Pending Verification
$10,000,000 CJ est. value
West Fargo, ND 58078

The Standard on 32nd
New Construction, Infrastructure - 6,600 SF
Pending Verification
$14,000,000 CJ est. value
West Fargo, ND 58078

Concrete Pavement Repair
Infrastructure
Bidding
$65,000 CJ est. value
West Fargo, ND 58078

Last Updated 08/08/2022 07:05 PM
Project Title

Visto Industrial Additions Pavement

Physical Address View project details and contacts
City, State (County) Horace, ND 58047   (Cass County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,161,933 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will consist of the following approximate quantities: 30,000 SY 8 Inch Non-Reinforced Concrete Pavement CL AE-Doweled 30,000 SY Subgrade Preparation or Reshaping Aggregate Base Course 1,200 LF 6" Sanitary Sewer Service 1,200 LF 4" Water Service Traffic Control and all miscellaneous work necessary therefor and incidental thereto. Site Directions: Please contact the Project Engineer if you need directions to the project location.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents