Similar Projects
Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Fairview Park - West Bluff Repair and Restoration - City of Costa Mesa
Renovation
Conception
$1,250,000 est. value
Costa Mesa, CA 92628

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Neighborhood Park Renovations: Sundowner and Vintage Parks
Renovation
Post-Bid
$950,000 est. value
Lake Forest, CA 92630

Kindergarten Playground Resurfacing
Renovation
Post-Bid
Costa Mesa, CA 92627

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Fire Station No. 4 Replacement - City of Laguna Beach
Demolition, New Construction, Infrastructure - 9,975 SF
Pending Verification
$6,100,000 CJ est. value
Laguna Beach, CA 92651

Shalimar Park Expansion - City of Costa Mesa
New Construction
Conception
$3,300,000 est. value
Costa Mesa, CA 92627

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Last Updated 03/23/2023 10:19 AM
Project Title

El Camino Real Park Booster Pump Installation

Physical Address View project details and contacts
City, State (County) Orange, CA 92868   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 23,2023 , this project has not yet been awarded. The project is expected to be awarded on April 11,2023.** The Contractor shall be registered with Department of Industrial Relations (DIR), State of California per Labor Code Section 177.1(a) at the time of bid. This project is subject to compliance monitoring and enforcement by DIR. All bids will be tabulated and presented to the City Council at the meeting of April 11, 2023. Contact: Paul Miller 714-744-6491 . All questions regarding this 'EL CAMINO REAL PARK BOOSTER PUMP INSTALLATION' are to be submitted by email to Paul Miller by March 2, 2023 by 12:00 p.m. SCOPE OF WORK AND PROJECT SPECIFICATIONS SCOPE OF WORK: SITE PREP: 1. Supply all labor & equipment necessary for the installation/construction of the new booster pump & irrigation modifications/improvements and other related work. 2. Supply temporary barrier fencing during construction. Barrier fencing to be six feet tall chainlink, free-standing type. Fencing to surround entire area of construction. DEMOLITION: 1. Remove existing pump, electrical equipment, irrigation fittings and equipment and return to the City. 2. Provide all demolition/removal of concrete pads, soil, and debris within the designed footprint of work improvement area. 3. All debris must be removed off site at the contractor's expense. 4. Provide the removal (off site) of all concrete, concrete blocks, metal scrap and footing soil at the contractor's expense. 5. Protect in place existing amenities to remain in place. CONSTRUCTION: 1. Provide and install new Watertronics Irrigation Booster Pump Station specified in Exhibit A, Plans and Specifications, including new concrete pad. 2. Concrete pad will be dimensions noted in pump specification. Concrete pad will be minimum 3 1/2 inches thick, and minimum 2500 PSI compression strength. 3. Provide the re-connection of all existing irrigation components (backflow, main lines, lateral lines, flow sensors, control wires, etc.) that may/will be disconnected or disturbed during this construction process. 4. Repair of all broken or disconnected irrigation components that occurs in any portion of the completion of this agreement will be repaired by the contractor to the satisfaction of City representative. 5. Provide the installation of one (1) marine grade aluminum enclosure, per detail. 6. Use existing electrical source from existing pump. Add new conduit as needed. 7. Excavation backfill shall be native soil, placed in twelve-inch lifts. Compaction is 90% for hardscape (i.e. walkways, picnic pads, basketball and tennis courts); and 85% in areas to be planted. Place topsoil at top six inches over trenches in planted areas. Upon completion, all trenches and excavation shall be filled flush with adjacent finish grades. 8. All removed and damaged turf will be replaced with West Coaster Tall Fescue sod from West Coast Turf or equivalent approved by City representative. PROJECT DESCRIPTION: The City of Orange, CA, a Municipal Corporation, is requesting qualified contractors to provide bids in accordance with the specifications prepared by City of Orange Staffing. All work shall also conform to City of Orange codes, ordinances and standards. The work will generally include, but not be limited to: Provide all work (labor, materials, and specified booster pump) necessary to install an irrigation booster pump, provide miscellaneous demolition, masonry, electrical, planting and irrigation work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents