Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Guaranteed Maximum Prices for Renovation Services at the Arts and Recreation Center (ARC)
Renovation
Post-Bid
Opa-locka, FL 33054

Douglas Park Community Center, D2
New Construction - 12,200 SF
Results
Miami, FL 33133

Betty T. Ferguson Natatorium Interior and Locker Room Upgrades
Renovation
Results
Less than $500,000 est. value
Miami Gardens, FL 33142

Miami Women's Club
Renovation, Addition - 34,180 SF
Construction
$7,000,000 est. value
Miami, FL

Liberty Square - Phase II
New Construction - 20,000 SF
Construction
$41,792,388 est. value
Miami, FL 33147

Stellar Golden Glades
New Construction - 4,585 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

West Fourth Avenue Residential Development
New Construction
Design
Hialeah, FL 33014

Oasis Clubhouse Gym Remodel
Results
Homestead, FL 33033

Ocean Club Beach Club
Addition - 2,000 SF
Construction
Less than $500,000 CJ est. value
Key Biscayne, FL 33149

Veridian Grove - Phase II
New Construction
Conception
Kendall, FL 33156

Fontainebleau Miami Beach Garage and Ballrooms
New Construction
Design
Miami, FL 33140

Reported 01/01/2020 12:00 AM
Project Title

Edison Community Resource Center Renovation

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $670,630
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replace approximately 16 existing interior lights in lobby with surface mounted 2’x2’ surface mounted LED lights, 4000 lumens, 4,000 -5,000 kelvin (Luminaire EPanl flat panel or equivalent). 2. Replace approximately 165 existing troffer lights with LED troffer lights (Luminaire, Lithonia, Philips or equivalent) specifications as above. 3. Installation of 25 wall pack exterior LED lights (equivalent of 200-250 metal halide) with photocells (Lithonia, Philips or equivalent). 4. Remove and replace all existing windows with impact resistant windows, includes removal and disposal of existing shutters 5. Installation of Solatubes in lobby. 6. Painting of all interior metal ceiling 7. Replace existing built up roofing, including tapered insulation (approximately 19,000 sf) 8. Install new receptionist desk in lobby, includes location/relocation of electrical and telecom connections. 9. Replace existing ceiling tile, (approx 33,500, elderly area excluded) 10. Painting and patching interior and exterior. 11. Install new VCT (contractor may install over existing flooring). Contracting to ensure full adhesion of existing floor prior to installation. Install matching cove base/base board in areas receiving VCT.(color and type to be selected by CAHSD). 12. Remove and replace existing carpet tile in office areas (color and type to be selected by CAHSD). 13a. Install laminated wood flooring in lobby area. 13b. Install laminated wood base boards in lobby areaa 14. Replace 2.5 ton A/C unit. 15. Remove and replace existing water fountains with dual station water fountains with bottle filler 16. Remove and replace storefront window in area 104 17. Remove and replace storefront window in RMS area 18. Remove and replace store front glass at front of lobby area 19. Remove and replace all outlet covers, blanks and light switch covers 20. Replace interior doors 21. Remove and replace counter tops in employee lounge 22. Remove all wood chair rails 23. Remove existing wall in Project FACE 24. Remove and replace storage room doors in conference room 25. Remove existing storm shutters at exterior of building 26. Remove existing windows. Provide and install new impact windows at exterior of building. 27. Remove existing light bollards at exterior of building and cap off.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents