Similar Projects
Reported | 01/01/2020 12:00 AM |
Project Title | Edison Community Resource Center Renovation |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL (Miami-Dade County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Clubhouse/Social Club |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | $670,630 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Replace approximately 16 existing interior lights in lobby with surface mounted 2’x2’ surface mounted LED lights, 4000 lumens, 4,000 -5,000 kelvin (Luminaire EPanl flat panel or equivalent). 2. Replace approximately 165 existing troffer lights with LED troffer lights (Luminaire, Lithonia, Philips or equivalent) specifications as above. 3. Installation of 25 wall pack exterior LED lights (equivalent of 200-250 metal halide) with photocells (Lithonia, Philips or equivalent). 4. Remove and replace all existing windows with impact resistant windows, includes removal and disposal of existing shutters 5. Installation of Solatubes in lobby. 6. Painting of all interior metal ceiling 7. Replace existing built up roofing, including tapered insulation (approximately 19,000 sf) 8. Install new receptionist desk in lobby, includes location/relocation of electrical and telecom connections. 9. Replace existing ceiling tile, (approx 33,500, elderly area excluded) 10. Painting and patching interior and exterior. 11. Install new VCT (contractor may install over existing flooring). Contracting to ensure full adhesion of existing floor prior to installation. Install matching cove base/base board in areas receiving VCT.(color and type to be selected by CAHSD). 12. Remove and replace existing carpet tile in office areas (color and type to be selected by CAHSD). 13a. Install laminated wood flooring in lobby area. 13b. Install laminated wood base boards in lobby areaa 14. Replace 2.5 ton A/C unit. 15. Remove and replace existing water fountains with dual station water fountains with bottle filler 16. Remove and replace storefront window in area 104 17. Remove and replace storefront window in RMS area 18. Remove and replace store front glass at front of lobby area 19. Remove and replace all outlet covers, blanks and light switch covers 20. Replace interior doors 21. Remove and replace counter tops in employee lounge 22. Remove all wood chair rails 23. Remove existing wall in Project FACE 24. Remove and replace storage room doors in conference room 25. Remove existing storm shutters at exterior of building 26. Remove existing windows. Provide and install new impact windows at exterior of building. 27. Remove existing light bollards at exterior of building and cap off. |
||||||||||||||||||
Details |
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |