Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

I-84: I-205 - Marine Drive Section of the Columbia River Highway
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
OR

2022 City Streets Overlay and Reconstruction Project
Infrastructure
Bidding
Pendleton, OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

Madison Street Improvements Project
Infrastructure
Bidding
Lafayette, OR 97127

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Schoolhouse Street Improvements
Infrastructure
Bidding
Depoe Bay, OR 97341

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Cooley Talus Road Extensions
Infrastructure
Bidding
Bend, OR

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

Last Updated 04/01/2022 01:51 PM
Project Title

2022 Street Overlay Project

Physical Address View project details and contacts
City, State (County) Redmond, OR 97756   (Deschutes County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $420,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes approximately 16,078 square yards 1 ½” taper grind at curb/gutter and 20’ match end grinds on designated streets and 8,457 square yards of 2 ½” grind for inlay. The city estimates the Project cost at $420,000, including mobilization and temporary traffic control.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents