Similar Projects
The Intersections Community Center Food Hall & Business Incubator
New Construction
Conception
Omaha, NE 68105

The Apex Business Center
New Construction, Renovation - 570,000 SF
Design
$105,000,000 est. value
Omaha, NE

WP-4 Reservoir and Associated Improvements
Infrastructure
Design
$200,000 CJ est. value
Omaha, NE 68102

BROOK PARK PAVING MAINTENANCE 2022
Infrastructure
Bidding
$99,632 CJ est. value
Omaha, NE 68102

72nd and Center Apartments - Omaha
New Construction, Infrastructure
Bidding
$102,000,000 CJ est. value
Omaha, NE 68124

Chipotle- Site Work
Renovation
Post-Bid
Omaha, NE 68022

District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Papio Creek Intake Damper Replacement
Infrastructure
Results
$915,000 CJ est. value
Bellevue, NE 68123

Tim Ohrt Park, Access Road, Parking and Site Improvements
Infrastructure
Results
$500,000 est. value
Bennington, NE 68007

The Crossroads
New Construction, Demolition - 900,000 SF
Construction
$553,000,000 est. value
Omaha, NE 68114

Costco Wholesale Off-Site Parking Lot / Omaha
Infrastructure - 153,409 SF
Construction
$200,000 CJ est. value
Omaha, NE 68154

Omaha Civic Auditorium Redevelopment
Infrastructure, Renovation
Pending Verification
$102,000,000 CJ est. value
Omaha, NE 68102

The Rows at Coventry
New Construction, Infrastructure
Pending Verification
$83,000,000 CJ est. value
Omaha, NE 68022

Abbott Drive / Industrial - City of Omaha
Demolition, New Construction, Infrastructure
Design
$20,978,259 CJ est. value
Omaha, NE 68110

Arcadia Ridge SID 621, Douglas County - Sanitary Sewer System - Section II
Infrastructure
Bidding
$290,000 CJ est. value
Jefferson, NE 68022

Last Updated 09/19/2022 12:01 AM
Project Title

Burger Detour

Physical Address View project details and contacts
City, State (County) Omaha, NE 68022   (Douglas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Burger Detour Project scope consists of: A new fast-food restaurant with wood framed structure. One of three facilities to be constructed in Omaha in 2023. This project is expected to begin late fall of 2022 with a summer 2023 opening. All invited bidders have associated work. Questions should be directed to Jesse Calabretto at jcalabretto@calabrettobuilding.com or (402) 657-7362. Please note, questions may not be answered if submitted within 48 hours of the bid deadline. CD's and Downloads containing a complete set of Bid Documents in PDF format are available upon receipt of a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc. Only complete sets of Bid Documents may be obtained. If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $30.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc.

Details

1 Story Above Grade, 2,258 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents