Similar Projects
Pine Gardens North Infrastructure Improvements
Infrastructure
Bidding
$2,930,100 est. value
Jupiter, FL 33458

Clear Lake Trail and Shoreline Enhancements
Infrastructure
Bidding
West Palm Beach, FL 33422

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Asset Maintenance Services State Road 9 (I-95) Corridor throughout Palm Beach County
Term Contract
Results
Less than $40,606,300 est. value
FL

Commons Parking Lot Expansion
Results
Less than $520,000 est. value
Royal Palm Beach, FL 33411

Amazon Delivery Station - DFH6
Build-Out, Infrastructure - 120,282 SF
Construction
Riviera Beach, FL 33404

Northmore Elementary Sidewalks
Infrastructure
Bidding
West Palm Beach, FL 33407

Gateway Boulevard and Military Trail Intersection Improvements
Post-Bid
$1,360,000 est. value
West Palm Beach, FL 33472

Greenacres Sidewalk Project
Results
Greenacres, FL 33463

Installation of an ADA Compliant Aluminum Railing and Retention Wall at the North Access of Lantana Beach
Infrastructure
Post-Bid
$120,000 est. value
Lantana, FL

Safety D/B Push Button for WWD Devices at Interstate Ramps
Results

Annual Small Concrete and Pathway Construction Contract
Term Contract
Results
Less than $1,350,000 est. value
FL

Contract to Replace the Nature Preserve Walking Trail and Repair Retaining Wall
Results
Less than $144,494 est. value
Lantana, FL 33462

Big Blue Trace Multiuse Trail Project
Results
Less than $801,000 est. value
Wellington, FL 33414

Reported 04/07/2022 12:00 AM
Project Title

Corbett (Boardwalk Phase II)

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33412   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $900,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The removal and replacement of portions of existing boardwalks, and construction of new low boardwalk and benches. The proposed improvements to Phase 2 of the Hungryland trail and boardwalk within the J.W. Corbett Wildlife Management Area include widening of a portion of the existing trail, installation of concrete slabs at the boardwalk ends, replacement of the existing decking and rails, replacement of piles in the same location, and construction of a new low-profile boardwalk above an existing trail portion through wetlands

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents