Similar Projects
Olmsted Lock and Dam Final Site Restoration
Design
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Dike & Revetment - USACE St. Louis District
Design
$15,000,000 est. value
Cairo, IL

Removal of Vermilion River Dam on the Vermilion River at Oglesby, Il and Bank Stabilization in the Vicinity of the Dam
New Construction
Bidding
IL

Vermilion River Dam Removal
Renovation, Demolition
Bidding
Springfield, IL

Olmsted Pole Barn 1 & 2 Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Olmsted, IL 62970

Mel Price Lift Gate Replacement
Post-Bid
Alton, IL

Lakeside Tunnel Isolation at Dallman Power Station
Renovation
Results
Springfield, IL 62701

Illinois River Basin Miter Gate Replacement
Results
$5,000,000 to $10,000,000 est. value
Joliet, Morris, IL

Peoria and LaGrange Dams Composite Wicket Gates
Design
Peoria, IL

Waukegan Harbor Breakwater Repairs, Waukegan, Lake County, Illinois
Post-Bid
$1,000,000 to $5,000,000 est. value
Waukegan, IL

Hammel Woods Dam Modification
Results
Shorewood, IL 60431

Crab Orchard Dam Spillway Concrete Repairs
Design
$1,000,000 to $5,000,000 est. value
IL

Mel Price Main Lock Overlook Alterations
Renovation
Post-Bid
Alton, IL 62002

McKinley Woods Preserve Bridge Over the I and M Canal Improvements
Results
Less than $170,000 est. value
Channahon, IL 60410

Chicago Harbor Lock Chamber Floor and Wall Repair
Renovation
Design
$25,000,000 to $100,000,000 est. value
Chicago, IL

Reported 08/24/2021 12:00 AM
Project Title

Replacement of Tainter Gate Brakes and Side Seal Heaters Carlyle Lake

Physical Address View project details and contacts
City, State (County) Carlyle, IL   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnish and install Tainter gate holding brakes complete with enclosure, brake wheels, and enclosure heaters as specified. The contractor is responsible for the following for removal and disposal of old holding brakes; supply and installing new holding brakes, enclosures, enclosure heaters; supply and installing new cabling from DC brake rectifier to new holding brakes, and new cabling from existing Tainter Gate Controller enclosures to new brake enclosure heaters. The contractor shall furnish and install tainter gate holding brakes complete with enclosure, brake wheels, and enclosure heaters as specified. The contractor is responsible for the following: a. Removal and disposal of old holding brakes b. Supply and install new holding brakes, enclosures, and enclosure heaters c. Supply and install new cabling from DC brake rectifier to new holding brakes, and new cabling from existing Tainter Gate Controller enclosures to new brake enclosure heaters.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents