Similar Projects
Biological Foul Air Mitigation Treatment System Subject Matter Expert and Process Equipment
Bidding
Kalamazoo, MI

Wastewater Treatment Plant Final Clarifier Improvements
Renovation
Bidding
Big Rapids, MI

WWTP Clarifiers Rehabilitation
Post-Bid
Marshall, MI 49068

Marquette Area Wastewater Treatment Facility Biosolids Improvement Project
New Construction
Post-Bid
Less than $5,000,000 est. value
Marquette, MI

WWTP Grit System Improvements
Results
Port Huron, MI

Wastewater Treatment Plant Headworks Odor Control Improvements
Results
Michigan Center, MI

Water and Wastewater Treatment On-Call Construction Services
New Construction
Post-Bid
Saline, MI

Blissfield Wastewater Treatment Plant Improvements
Results
Less than $5,350,000 est. value
Blissfield, MI 49228

Lagoon Transfer Valve Repair Services
Renovation
Post-Bid
Allegan, MI

Primary and Secondary Clarifiers Rehabilitations at the Grosse Ile WWTP
Results
Grosse Ile, MI 48138

CWSRF Project Battery B Grit and Primary Settling Tanks
Renovation
Post-Bid
Flint, MI

2021 West Tertiary Filters Pipe Replacement
Results
Ypsilanti, MI

WWTP Backwash Pump
Infrastructure
Post-Bid
Novi, MI 48377

Clean Water Recovery Facility Improvements, General Wastewater Improvements Phase II Contract B
Results
Manistee, MI 49660

WWTP UV Building Fourth Channel
Renovation
Post-Bid
Ypsilanti, MI 48198

Last Updated 03/09/2022 10:43 AM
Project Title

WWTP Tertiary Filter PLC Replacement Project

Physical Address View project details and contacts
City, State (County) Ann Arbor, MI 48105   (Washtenaw County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Services of a firm to upgrade four programmable logic controllers (PLCs) in the Wastewater Treatment Plant (WWTP) Tertiary Filter Building. General scope of work is to furnish and install all components necessary to make a complete and operable system. All work shall be coordinated with the Owner to minimize disruptions in operation. Programming shall be completed offline prior to removing any existing components. The final transition to the upgraded system shall be completed in one 8-hour workday. Existing infrastructure shall be maintained throughout the project and shall be capable of being reinstalled with full functionality in the event the upgrade cannot be completed in one work day. Photos of the four existing PLCs are provided for reference in Attachment A. Panel drawings for CP 70, located in the Tertiary Filter Building Control Room, are also provided for reference in Attachment A. Note, that only one of the two PLCs shown on CP 70 panel drawings provided in Attachment A remains. One PLC was removed and not replaced approximately 10 years ago. This Project shall include the following requirements: ? Remove and replace the existing PLCs and remove the touch screens and provide covers over the touch screen cutouts. Remote access into the City of Ann Arbor’s PICS system will not be allowed. All work is to be performed onsite when connected to the City system for upgrading and programming. During PLC installation, programming and startup, six of the 12 tertiary filters must remain in service at all times. ? The Consultant shall be Rockwell Certified or engage the services of a Rockwell Certified Integrator to perform the work. ? The Consultant shall submit a proposed schedule for PLC replacement, programming and startup services that includes the number of meetings with City of Ann Arbor staff. Also, as part of their proposal, the Consultant shall submit a list of expectations for City of Ann Arbor staff in terms of work tasks and estimated level of effort during PLC replacement work. ? The Consultant shall provide WWTP staff a minimum of seven days’ written notice prior to removing a PLC and receive authorization by the City of Ann Arbor before work can proceed. ? Prospective Consultants are to provide a Work Plan that includes the project approach and project requirements per Section III of this RFP.

Details

Sewage Treatment Plant, Renovation.
Division 46 - Water and Wastewater Equipment, Filtration Equipment, Filter Media.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents